DUNIN7 · Done In Seven LLC · Miami, Florida
It is written for you first. Every item has a plain-English line saying what it is and why it matters. Technical cross-references sit at the end of each line for the sessions; you can ignore them.
It updates as we go. Whenever an item's status changes, the responsible session saves the next version of this file (v0.2, v0.3 …) with the change made and the date on it — old versions stay as history, per our filing rules. The highest-numbered version is always the truth. Updating this list is part of every session's closing duty, like the rest of its reporting.
The statuses, in plain terms:
Every substantial piece of system documentation gets an easy-to-read plain-English companion for your consumption, with examples where they help. You never have to ask for it; you only ask when you want more explanation.
The full live demonstration works with no excuses — a firm's own document becomes a working engagement, information flows in, the summary view appears, a finished report comes out, a question gets a truthful answer with its sources shown, and an outsider can contribute without seeing anything else.
B-1Fix the memory plumbing. Done 2026-07-30
Eight kinds of recorded events were never registered with the replay machinery, so six real engagements — including your biggest — couldn't produce their summary view. The fix was built, tested (the walk-audit engagement produces its summary view on the fixed code), accepted at its review gate, merged with a guard that stops the mistake from ever being reintroduced, and pushed.
CR-2026-158 v0.2 executed · engine merge c4014d6 · main a317051 · tag registry-completeness-v0_1 · push-verified · Checkpoint A report + implementation notes filedB-2Put the fix live. Done 2026-07-30
The Operator-directed restart is done and the live engine verified running the fixed code. Engagement E0060 — which yesterday silently could not produce a summary — will produce one the first time anything asks it to, as will the other five affected engagements.
B-3Your browser walk-through. Needs you: act
A short checklist (already written, with the exact commands to start things up) where you click through the system and say what feels right or wrong. Fifteen minutes. Your answers sharpen B-4. This is the only thing standing between us and B-4.
B-4The completion plan for the missing screens. Waiting on B-3
A session takes the audit's break list and your walk-through notes and writes the precise, ordered plan for items B-5 through B-9.
The completion scoping note, from walk-audit report W-listB-5The Manifestation screen. Waiting
Today the "organize what we know" room is an empty placeholder. This builds the real screen — including a marker that tells you when the view has gone stale, so what happened silently to E0005 (its newest summary is 25 versions out of date and nothing says so) can never happen invisibly again.
B-6The Shaping screen. Waiting
The room where knowledge is arranged for a particular reader — also a placeholder today. This makes it real.
B-7The Rendering flow, end to end. Waiting
Producing the finished document and downloading it, smoothly, from the screen — no workarounds.
B-8Teach the Companion the last three rooms. Waiting
Today you can talk to the Companion while gathering information, but not to organize, shape, or render — for those you'd have to leave the conversation and use raw mechanics. The audit counted eight forced exits. This closes them: you ask, it does.
B-9The "show me where this came from" walk. Waiting
Click any statement in a finished report and walk backward — to the shaped view, to the record, to the person who said it and when. The machinery underneath already does this perfectly; no screen shows it. This is the product's promise made visible.
B-10Outside contributors, safely. Ready — can run now
Lets a founder or a customer reference contribute to a deal file through a one-time link — everything they add is labelled as theirs and held for your team's approval, and they can see nothing else. Fully specified and approved.
CR-2026-157, filed · at Step 0: its OVA naming is historical trajectory — GRANTHA holds the authorization seatB-11Make answers truthful. Waiting on B-15
In testing, a tiny six-note engagement answered a question with an old, already-corrected value presented as current. Before search gets better, answers must stop being wrong. Step one is finding out what happened — which is why the June–July history pass comes first.
Corrected at v0.5: v0.4 named B-16 as the prerequisite; the history check is B-15B-12Make the record searchable. Waiting on B-11
Today a question just looks at the fifty most recent notes, whatever they are — no real search exists. This builds it, over the notes and the text of uploaded documents. The biggest single piece of engineering on this list.
B-13Ask your engagement. Waiting on B-12
The payoff: a partner asks a plain question — "what did the reference calls say about churn, and what does the contract actually promise?" — and gets a truthful answer with every source shown, which can then be kept in the record, marked as machine-assisted. When this lands, our rule against demonstrating question-answering lifts.
Limits and order confirmed by the Operator, 2026-07-30B-14Read spreadsheets and slide decks. Ready — independent
Today the system can't take in the cap table, the financial model, or the pitch deck — the heart of a data room. This adds those file types and fixes an inconsistency between the two upload paths.
B-15Catch the record up on June–July. Ready
Engine work landed in a window our record never absorbed. A session reads the history and writes it up properly. Also feeds B-11's investigation — this is now the gate in front of B-11.
Manifest absorption pass, v0.75 residueB-16Update the foundation document. Ready to draft Commit needs you: act
Three corrections queued for the seed, including replacing the outdated authorization wording. Drafting approved 2026-07-30; a session drafts, you read, and only you approve the new version into the record.
Seed v0.13, three ridersB-17The portfolio filter. Ready
A small fix: the dashboard can already group engagements into workspaces but won't filter by them. One parameter. Gives the fund-level "compare my deals" view its plumbing.
B-18File the four protocol requirements. Ready
Your agent-construction idea produced four precise requirements for the identity and authorization specs. Approved 2026-07-30 — a session files them in writing with the right owners so they're waiting when those specs next move.
B-19Keep this list alive. In progress
Sessions maintain it; you read it.
B-20The marketing website. Ready
All five answers confirmed 2026-07-30 — site scope, the headline sentence, "book a working session" as the button, the honesty rule for every claim, and the go-ahead to write the full text. The answers themselves are in the marketing alignment note; the session writing the copy reads them there rather than from this line.
B-21Reply to Aldous. Needs you: act
Draft chosen 2026-07-30 — the shorter, warmer one. Edit if you like, then send.
B-22Package Stele for the outside world. Waiting — background track
The identity component, cleaned up so a stranger can run it — plus assembling its papers in the shape a security evaluation would want, at little extra cost while we're in there.
B-23The security story, told right. Ready
All four answers confirmed 2026-07-30. Not "we sell security" — rather: the incidents in the news become our backdrop, a proper assurance page speaks the security buyer's language, and certification comes before category. Includes making "a rogue agent is an unsigned agent" the flagship of our standards work.
B-24Investor-visible FORAY. Waiting on B-10
Confirmed 2026-07-30: investor-hosted first, not target-hosted. A session scopes the adapter once B-10 lands, and the pilot conversation leads the build rather than following it — what a real investor asks for shapes what gets built.
Moved out of the parked list at v0.5, where it sat as "the live-operations feed to investors (after B-10)" · target-hosted visibility stays parkedRestricted-visibility slices 2–3 (to be reworked in grant language when their day comes) · target-hosted visibility · the protocol wire-format changes (queued to the next version boundary by design) · OVA's remaining standalone role (one conversation, whenever) · cross-fund questions · the stray zip file in the record.
The live-operations feed to investors left this list at v0.5 and is now B-24.
None open. Decisions 1–8 are all answered.
The history is kept below.
The queue is clear of questions. What is left of your involvement is three acts — the walk-through (B-3), sending the Aldous reply (B-21), and reading the seed draft before it commits (B-16).