DUNIN7 · LOOMWORKS · RECORD
record.dunin7.com
Status Current
Path session-handoffs/loomworks-session-handoff-stele-brief-v0_4-authoring-v0_1.md

Loomworks — Session Handoff — Stele brief v0.4 authoring — v0.1

Version. 0.1 Date. 2026-06-14 Author. Marvin Percival (DUNIN7 Operator), drafting supervised from Claude.ai; push/commit by CC on DUNIN7-M4. Status. Session handoff. Records the v0.4 brief authoring session: what landed on the record, current loomworks-record state, the decisions settled and surfaced, and the next live action (the Phase 1 change request). Markdown primary (technical consumer).


Plain-language summary

This session drafted the Stele body-of-work brief v0.4, amending v0.3 with the standalone-distribution destination, the persons.id FK framing for Phase 1, and a re-sequenced phase plan. It then bumped the current-status manifest to v0.54 to point the live build front at v0.4. Both are committed and pushed to loomworks-record origin/main at 773b6d4. The next live action is the Phase 1 change request, which must surface the FK decision (own-its-own-table vs. host-supplied-contract) explicitly.


1. What landed this session

Two documents, both on loomworks-record origin/main, pushed fast-forward 8f181c2..773b6d4:

| Commit | Document | What it is | |---|---|---| | a7ed9e6 | standing-notes/loomworks-stele-body-of-work-brief-v0_4.md | The current Stele frame. Amends v0.3. v0.3 preserved beside it. | | 773b6d4 | current-status/current-status-manifest-v0_54.md | Pointer bump — live build front now names brief v0.4. Carries v0.53 Phase-0-complete state forward. |

origin/main == local == 773b6d4. Working tree clean except a pre-existing untracked planning/loomworks-companion-path-to-finalized-sequencing-plan-v0_1.md (not this session's, never staged).

2. What v0.4 added to v0.3 (the drafting work)

Settled going in (treated as settled, not re-litigated):

Worked out this session (the open items, now drafted):

3. Current record state (orientation pair after this session)

4. Build-front state (carried from manifest v0.54 / v0.53, unchanged this session)

5. Next live action — the Phase 1 change request

Fresh session. Draft the Phase 1 CR for the Stele extraction. It must:

First-reads for that session: seed v0.12, manifest v0.54, brief v0.4 (§4G/§5B especially), the Phase 0 completion record (the Phase 1 handoff section), and the integration design v0.2 (the mint↔onboarding seam and §5.2 table-split note).

Open Operator decisions named in brief v0.4 §7 (still open):

  1. The persons.id FK decision (own-table vs. host-contract) — resolves in the Phase 1 CR.
  2. Confirm the re-sequenced phase plan (standalone deliverables in Phases 6–7; agent build sequenced independently of the Miami date).
  3. Set the Miami date against real phase progress.

DUNIN7 — Done In Seven LLC — Miami, Florida Loomworks — Session Handoff — Stele brief v0.4 authoring — v0.1 — 2026-06-14