Version. 0.1
Date. 2026-05-09
Provenance. Claude.ai session that drafted CR-2026-065 (Phase 50), walked CC through the 5-step Phase 50 execution, held at Checkpoints A and B, closed at the tag. Same chat lifetime absorbed the quick-capture + mobile-presence investigation pair into loomworks-queued-directions-and-deferred-work-v0_3.md. Operator: Marvin Percival.
Status. Session handoff. Self-sufficient — a fresh chat with this document plus the rest of project knowledge can pick up the manifest v0.36 update and Phase 51 scoping.
Two parallel workstreams landed in this chat's lifetime. Both feed the next manifest consolidation pass (v0.36); one feeds Phase 51 scoping directly.
Workstream A — Phase 50 build. Companion-as-Authority decision logic for grants + public credit-request form (engine half) + conversion-credit asset_id Operator override. Closed cleanly on 2026-05-09. The three primary build items the v0.2 scoping carved out are in. Both repos tagged phase-50-companion-as-authority-and-public-form and pushed. Test posture: engine 2,095 passed (+72 over Phase 49), 26 skipped, Alembic 0064 (no migration consumed). Operator Layer 139 vitest passed (+11 over Phase 49), 29 test files, eslint/tsc/build clean. All 17 acceptance gates green. Zero halt-amend events. Zero Operator-elective amendment cycles (Phase 49 had one canonical instance via Step 4 amendment scoping; Phase 50 had none — Step 0 absorption pre-empted all friction). Reserved buffer slots 6–8 unconsumed (P50-D13 reserved-not-skipped: the buffer's value is its presence, not its consumption).
Workstream B — Mobile-presence + quick-capture investigation pair. Two paired investigations addressing an Operator question about Companion presence on mobile. Both landed; both absorbed into queued directions v0.3 (Section 6, three entries). Two methodology-finding-grade observations carry forward to manifest v0.36 absorption alongside Workstream A's findings. The investigation pair is not a build deliverable — it's architectural framing material with implementation-readiness Phase 53+ at earliest, Phase 54+ for mobile build, with engineering-capacity as the larger pacing constraint (organizational, not methodological).
Three workstreams open. Sequence options vary in load.
Mirrors the Phase 48 → Phase 49 → Phase 50 cadence: handoff → manifest → next-phase scoping in three sessions, each scoped to one deliverable.
what-dunin7-is-building-v0_21.md consolidation.loomworks-phase-51-scoping-note-v0_1.md.Acceptable if scope is tight. Manifest absorption + Phase 51 scoping fold into a single session.
The manifest pass should land first within the session because Phase 51 scoping reads from it (specifically from the new Section 4 watch-this items and the consolidated methodology findings).
what-dunin7-is-building-v0_21.md as the next session. The v0.21 consolidation is its own larger workstream — Phase 47/48/49/50 build findings + the investigation pair findings + the Discovery arc material accumulated since v0.20. It reads from manifest v0.36 (which folds these in for the consolidation pass to consume). The manifest is the absorption layer; the methodology document is the consolidation layer. Don't conflate them. The v0.21 consolidation runs at its own pace, parallel to Phase 51 build, not blocking it.
| Document | Version | Where |
|---|---|---|
| phase-50-cr-companion-as-authority-and-public-form-v0_1.md | v0.1 | Drafted by Claude.ai. Archived at docs/phase-crs/ in engine repo at Step 0. Active CR. |
| phase-50-implementation-notes-v0_1.md | v0.1 | Drafted by CC at Checkpoint A. Superseded. |
| phase-50-implementation-notes-v0_2.md | v0.2 | Drafted by CC at Checkpoint B. Active impl notes. Records four methodology findings + 13-item carry-forward. Archived at docs/phase-impl-notes/. |
| phase-50-step-0-findings-v0_1.md | v0.1 | Pre-existing (CC, prior session, 2026-05-08). Operator-committed between sessions as 533129f. Preserved at docs/phase-impl-notes/. |
| loomworks-quick-capture-engagement-investigation-v0_1.md | v0.1 | Drafted by Claude.ai. Superseded. |
| loomworks-quick-capture-engagement-investigation-v0_2.md | v0.2 | Drafted by Claude.ai. Active investigation. |
| loomworks-mobile-presence-investigation-v0_1.md | v0.1 | Drafted by Claude.ai. Active investigation. |
| loomworks-queued-directions-and-deferred-work-v0_3.md | v0.3 | Drafted by Claude.ai. Section 6 added (entries 6.1, 6.2, 6.3). Active queued-directions document. |
| loomworks-session-handoff-2026-05-09-v0_1.md | v0.1 | This document. |
Engine repo (DUNIN7/loomworks-engine):
| Commit | What |
|---|---|
| 533129f | Phase 50 Step 0 findings (pre-CR scoping evidence; pre-existing, Operator-committed between sessions) |
| 869a019 | Phase 50 substrate (CR-2026-065 v0.1 §16 Steps 0–5): companion-as-authority and public form — all source/tests + CR archive at docs/phase-crs/ |
| c01124d | Phase 50 Checkpoints A/B: implementation notes (v0.1 + v0.2) |
Tag phase-50-companion-as-authority-and-public-form (annotated, object 67ba251) points at c01124d.
The three-commit shape (Step 0 findings + substrate + impl notes) is one commit longer than Phase 49's two-commit shape because the Step 0 findings landed as a separate atomic commit between sessions. Worth flagging: pre-existing-as-separate-commit is a cleaner Discovery-trajectory shape than absorbing-at-substrate-archival. Phase 51 may want to adopt this discipline — commit Step 0 findings before the substrate commit when CC produces them in a separate session from the substrate work.
Operator Layer repo (DUNIN7/loomworks):
| Commit | What |
|---|---|
| e4c09e0 | Phase 50 Operator Layer (CR-2026-065 v0.1 §13): companion-as-authority approval card |
Tag phase-50-companion-as-authority-and-public-form (annotated, object fd8177a) points at e4c09e0.
The single-commit shape on the frontend matches Phase 49's pattern — Step 4 shipped the only frontend slice (the <GrantDecisionApprovalCard> component + tests), tightly coupled to the substrate commit on the engine side.
The implementation notes v0.2 carry the full step-by-step record. This handoff captures the high-level trajectory:
docs/phase-crs/.read_credit_management_assertions(category=...) parameterized; _on_api_key_saved_for_conversion extended with override resolver; asset_id_source and override_assertion_id recorded in flow metadata.POST /authority/grant-request public endpoint; pydantic-validated body; system-actor sentinel FORM_SUBMITTER_ACTOR with deterministic UUID …0050 (Phase-byte convention mirroring _BOOTSTRAP_ACTOR …0048-…004c); slowapi middleware + decorator; CORS env-var-driven allowlist (loomworks_cors_origins).grant_request_received events; reads supporting Memory; composes decision prompt; produces GrantDecisionProposal held assertion.<GrantDecisionApprovalCard> (sibling component to <ProposalApprovalCard>, both wrapping <NotificationCard>); Approve invokes seam.issue_grant(grant_kind='form_initiated'); Decline advances proposal state.prompts/credit_voice/grant_proposal.md voice template + AI-invisibility carve-out comment.uuid.uuid5. Live _BOOTSTRAP_ACTOR precedent uses Phase-byte convention (…0048 Phase 48, …0049 Phase 49, etc.). Form submitter takes …0050 for Phase 50. Methodology-richer than uuid.uuid5 would have been: Phase-byte encoding makes "which phase introduced this sentinel" recoverable from the UUID itself.loomworks_cors_origins: str = "" (lowercase config field), mirroring webauthn_rp_origin: str precedent rather than the CR's tentative LOOMWORKS_CORS_ORIGINS. CR §10.2 hedged this with [CC verifies]; convention found, name conformed.rate_limit.py module rather than embedded in app.py. Cleaner module separation; same wiring otherwise.read_credit_management_assertions keeps requesting_engagement_id and requesting_person_id kwargs; category added alongside, not instead. Live signature retains the OVA-stub-style audit surface. Parameterization is purely additive. The "live-string-from-codebase, not placeholder-from-CR" discipline doing exactly its job.EmailStr requires the lib); added as a transitive dep alongside slowapi.Four findings from the build itself:
ActorRef UUIDs use Phase-byte convention (…0048 Phase 48 _BOOTSTRAP_ACTOR; …0050 Phase 50 FORM_SUBMITTER_ACTOR). Recoverability property: the phase that introduced a sentinel is decodable from the UUID itself. Reusable for any future system-actor sentinel. Methodologically richer than uuid.uuid5(namespace, name) because it retains the Phase-introduction trace at the data layer.read_credit_management_assertions is the canonical instance. Reusable as drafting-discipline guidance for future CRs that sketch substrate signatures.Plus one trajectory-level finding worth surfacing at manifest v0.36 §2:
phase-49-step-4-amendment-scoping-v0_1.md → CR v0.3 → Step 4b — the canonical instance of substrate-friction-discipline-pattern, Phase 49 Finding 6). Phase 50 had zero. The friction that would have been mid-build amendment in Phase 49 became scoping v0.2 absorption in Phase 50. The discipline is maturing through the cadence: Step 0 verification at scoping time pre-empts mid-build amendment when the verification catches architectural friction beyond naming. Reusable as Phase 51+ discipline: invest in scoping-time Step 0 to compress mid-build amendment cycles.CR §20 listed 10 explicit carry-forwards. Impl notes v0.2 added three surfaced during build, the most notable being Phase 45 end-to-end integration testing for grant-decision dispatch — the substrate-tests-with-mocked-LLM posture from Step 3 left an end-to-end gap that wants its own coverage in Phase 51.
Full 13-item list (consolidating CR §20 and impl notes v0.2 §7):
Primary build candidates:
Secondary or conditional:
<GrantDecisionApprovalCard> (alpha is Approve/Decline only).Continuing parallel work:
grant_proposal.md (per P50-D14: ongoing Operator work, not Phase 51 amendments).Substrate-gap-dependent or deferred:
Plus three additional items from impl notes v0.2:
phase-50-implementation-notes-v0_2.md §7 for the exact phrasing)The fresh chat reading impl notes v0.2 §7 has the canonical 13-item list; this handoff captures the spine.
Two paired investigations + queued-directions absorption.
Trigger. Operator question: "Would it be possible to have the Companion present and listening on my mobile (iPhone or Android) similar to how Siri is always present on my iPhone? I would like to be able to say 'Hey Companion, I parked on level 10.'"
The question carried three claims that decomposed into two engagements:
Two paired investigations followed.
Quick-capture investigation v0.2 (loomworks-quick-capture-engagement-investigation-v0_2.md): substrate side. Bidirectional Memory traffic on a fast path (write-clean / write-with-resolution / read modes). Voice register family of four templates. Methodology-finding-grade observation: single-valued vs. multi-valued slots as engagement-declared property; Companion-noticed supersession on the held layer as distinct from Operator-explicit retraction.
Mobile-presence investigation v0.1 (loomworks-mobile-presence-investigation-v0_1.md): capture-device side. Multi-surface composition (App Intents/App Actions, foreground listener, tap-to-speak surfaces, non-voice, conversational chat). Methodology-finding-grade observation: mobile is an Operator Layer surface, not a forked substrate — federation through shared substrate APIs; per-surface UX optimization; Companion-name authority unified.
Queued directions v0.3 (loomworks-queued-directions-and-deferred-work-v0_3.md): Section 6 added with three entries (6.1 quick-capture; 6.2 mobile-presence; 6.3 mobile-engineering capacity). Discoverability keywords extended for the three new entries. Provenance and trajectory notes preserved.
Two findings from the investigation pair, both Section 2-grade:
companion_name, Phase 42/49/50 voice composition, Phase 45 dispatch surface, Phase 48 passkey auth). Per-surface UX optimization; Companion-name authority unified across all surfaces. Naming-neutral and form-factor-neutral — same principle would apply to a future TV surface, car surface, or any other capture device. The unifying principle from quick-capture v0.2 §4.3.Plus one watch-this for manifest v0.36 §4:
Worth listing because the next manifest pass should preserve these in some form during consolidation:
Both investigations explicitly not implementation-ready. Sequence:
Phase 51 scoping should not attempt to fold either in.
Reading order, sequenced for the recommended Manifest v0.36 absorption session:
loomworks-session-handoff-2026-05-09-v0_1.md) — primary.phase-50-implementation-notes-v0_2.md (engine repo docs/phase-impl-notes/) — the canonical Phase 50 impl notes; reads with this handoff.loomworks-queued-directions-and-deferred-work-v0_3.md — Section 6 absorption layer for the investigation pair.loomworks-quick-capture-engagement-investigation-v0_2.md and loomworks-mobile-presence-investigation-v0_1.md — investigation pair source material.current-status-manifest-v0_35.md — the document being absorbed-into.phase-49-implementation-notes-v0_2.md — still-pending input to v0.21 consolidation; its findings live in the manifest already (v0.35 entry 91), but the consolidation backlog needs the v0.21 pass.phase-50-cr-companion-as-authority-and-public-form-v0_1.md — Phase 50 CR (active); reference for §20 carry-forward shape.phase-50-step-0-findings-v0_1.md — pre-CR scoping evidence; now at engine repo docs/phase-impl-notes/ and committed as 533129f.For the Phase 51 scoping session (after manifest v0.36 lands):
loomworks-deployment-strategy-v0_2.md — for marketing-site coordination context.loomworks-invitation-credit-referral-scoping-note-v0_7.md — for SMTP / grant-flow context.DUNIN7/loomworks-engine): 2,095 tests passed, 26 skipped, Alembic head 0064, working tree clean on main. Tag phase-50-companion-as-authority-and-public-form at engine c01124d (annotated tag object 67ba251). Pushed to origin.DUNIN7/loomworks): 139 vitest passed, 29 test files, eslint/tsc/build clean. Tag phase-50-companion-as-authority-and-public-form at frontend e4c09e0 (annotated tag object fd8177a). Pushed to origin.DUNIN7/loomworks-ui): unchanged.Phase 50 build closed cleanly. Investigation pair filed into queued directions v0.3. The chat that produced this handoff stands down here. The next chat opens with manifest v0.36 absorption per §2.1.
DUNIN7 — Done In Seven LLC — Miami, Florida Loomworks Session Handoff 2026-05-09 — v0.1 — 2026-05-09