CR-2026-206 — Checkpoint A report — v0.1

Date. 2026-08-12 · CR. change-requests/cr-2026-206-loomworks-creation-terminal-control-v0_1 · Baselines at Step 0. Engine a367db7, surface 6175e45; both trees clean. Built at. Engine cd91176, surface 7ac3cb2 — committed, NOT tagged, NOT pushed, NOT deployed. Halted at Checkpoint A.

The Step-4 catch, first — it changed the diff

The live eye-test's terminal sentence routed to a THIRD sibling. "That's everything. Set the project up.", typed live in a fresh door-1 conversation, classified finalize_project — not the commit_project_draft every scoping replay measured — and hit that handler's own project-less dead end ("I need to know which project to finalize"). The scoping's replayed histories never surfaced this sibling; a fresh conversation's different wording did. The acceptance gate as written covers it ("no project-less path reaches the dead-end reply"; "the exact terminal sentences reach step-up live"), so the net was extended to finalize_project's project-less branch mid-execution — same one-line shape, same target handler, its test observed failing first (via stash against the pre-fix tree). The confusable-sibling set is now known to be three, and both dead-ending members are netted.

Steps 0–4, as run

Left standing for the Operator — deliberately, per your instruction

Deviations, named

  1. The finalize_project extension (above) — within the gate's written scope; reported here rather than silently absorbed.
  2. The control's on-screen check moves post-deploy (the CR-204 precedent): the deployed surface predates the control; its rendering is covered by the four component tests, and Step 5's post-deploy eye-test covers it live.
  3. The typed-path eye-test necessarily exercised the net, not the hint (the deployed surface can't send the exit hint yet) — which is the right order: the net is what catches sentences the control doesn't send.

seed-mutability impact

Kind C — no contact. Checked: routing changes, a surface control, composed strings; the creation seams reached carry their own unchanged seed handling. A null finding is an entry; recorded either way.

Acceptance-gate status (CR §6)

  1. Both doors reach the step-up/ask live on the exact scoping sentences — door 1 to step-up observed; door 2 to the ask observed (its commit path is the same handler door 1 traversed).
  2. Fall-through pinned — green, now for both dead-ending siblings; the no-creation-history edge asks.
  3. The promise armed — green (closer live-verified; template source-asserted).
  4. Control tests — green (4/4; hint carried; typed path open).
  5. Suites green; gates clean. Push runs + redeploy + post-deploy control eye-test: pending the gate.
  6. seed-mutability recorded.

Halted. Awaiting GATE A APPROVED — PROCEED for CR-2026-206 before Step 5 (tag cr-2026-206-creation-terminal-control, push both, watch both runs, redeploy, post-deploy control eye-test).


DUNIN7 — Done In Seven LLC — Miami, Florida — CR-2026-206 Checkpoint A — v0.1 — 2026-08-12