DUNIN7 · LOOMWORKS · RECORD
record.dunin7.com
Status Current
Path session-handoffs/cr-2026-204-checkpoint-a-v0_1.md

CR-2026-204 — Checkpoint A report — v0.1

Date. 2026-08-12 · CR. change-requests/cr-2026-204-loomworks-chat-provenance-marker-v0_1 · Baselines at Step 0. Engine b4a7881 (moved from the drafted 64610b4 by CR-2026-203 — expected), surface 35a49c9; both trees clean. Built at. Engine 7c4d270, surface 6175e45 — committed, NOT tagged, NOT pushed, NOT deployed. Halted at Checkpoint A.

Steps 0–4, as run

The § 0.2 tripwire — reporting per the Operator's instruction

Nothing in the build needed to decide whether to stamp. Every assignment followed from which branch composed the reply — branch identity, not content. No halt was triggered; the diff contains no reply-content inspection of any kind (gate item 4 holds).

Deviations, named

  1. The marker's on-screen live observation moves to Step 5, post-deploy. The production surface serves the old build (the marker element doesn't exist in it), rebuilding it IS the gated deploy, and the dev host (3001) has no session — its cookie is host-scoped and passkey sign-in is the Operator's act. So Step 4's surface-live half is covered by the four component tests plus the live wire/persistence verification above; the on-screen marker gets eye-tested on app.dunin7.com immediately after the gated redeploy, before the CR closes. If you'd rather see it live before the gate: sign in once on loomworks-dev.dunin7.com and say so — I'll rerun the eye-test there instead.
  2. The dev engine now serves the CR-204 tree (bounced for the eye-test) — one CR ahead of the "about to be main" state you accepted for 203. Say the word to revert it to b4a7881 while the gate is open.
  3. Eye-test venue as in CR-203: Marvin + E0121 (the passkey constraint, previously accepted); teardown complete.

seed-mutability impact

Kind C — no contact. Checked across the diff: the stamp reads the pipeline branch; the column is on conversation_turns; the surface reads the wire field. The delegated branch carries seed-derived draft content through it, and the marker reads none of it. A null finding is an entry; recorded either way.

Acceptance-gate status (CR §6)

  1. Exhaustive stamping — green (AST test + per-branch pipeline tests).
  2. Null discipline — green (pre-CR row projects null; no backfill in the diff; surface renders null as absent).
  3. Unconditional pinned — green (the small-talk fence test, wire + persisted + rendered).
  4. No detector anywhere in the diff — confirmed (and the tripwire never fired).
  5. Suites green (engine 3693/0, surface 769/0); gates clean. Push runs + surface redeploy + post-deploy marker eye-test: pending the gate.
  6. seed-mutability — recorded above.

Halted. Awaiting GATE A APPROVED — PROCEED for CR-2026-204 before Step 5 (tag cr-2026-204-chat-provenance-marker, push both repos, watch both runs, redeploy the surface per the recorded procedure, eye-test the marker live).


DUNIN7 — Done In Seven LLC — Miami, Florida — CR-2026-204 Checkpoint A — v0.1 — 2026-08-12