DUNIN7 · LOOMWORKS · RECORD
record.dunin7.com
Status Current
Path protocols/grantha/GRANTHA_TO_FORAY_STATUS-v0_1.md

GRANTHA → FORAY — Status Update — v0.1

Version. v0.1 Date. 2026-07-12 From. GRANTHA project. To. FORAY project. Carrier. Marvin Percival, DUNIN7 Operator. Status. Cross-project status report, uncommitted. Informational plus a short list of asks. Epistemic note: GRANTHA's session set is grounded in memory-reconstruction of its Discovery Record v0.12 pending a source read (Ratification Ledger §1); items below marked ratified are Operator-decided, everything else is recommended or open and labeled as such.


1. Where GRANTHA stands, in one paragraph

GRANTHA completed a major design session on 2026-07-12. The headline for FORAY: GRANTHA has dropped zero-knowledge proving entirely (ratified) and FORAY is its sole proof layer. GRANTHA is now a FORAY-anchored authorization system — grants, machine-speed reversible containment (clamp), human-gated revocation (kill), and a fast local authorizer on the access path. The session produced the grant-check seam contract, the clamp mechanics, a twice-run adversarial threat review, an anchoring decision sheet, a policy-DSL scope, and a full self-audit with remediation. The core construction is judged solid by the Operator; most parameters await ratification.

2. What this means for FORAY — the relationship, restated

3. The anchoring interface, as currently designed (recommended, adoption sheet awaiting Operator ratification)

4. Asks of FORAY

  1. Bundling parameters. GRANTHA's containment-latency story and its carried-credential freshness bound are both blocked on FORAY's actual bundling cadence (the two-clocks problem: GRANTHA emission is instant-local, anchoring is bundle-windowed). Numbers or a pointer to where they'll be specified.
  2. Expedited-lane feasibility. Does FORAY support (or intend) a request-expedited/next-bundle path for the containment lane, and at what cost?
  3. Off-chain body availability. GRANTHA's blinded envelope depends on bodies being retrievable for authorized disclosure and dispute. This is carried on GRANTHA's records as a FORAY-side named dependency, unsolved — status?
  4. Burst behavior. Under a mass-clamp event (GRANTHA's threat finding U6: a captured oversight principal clamping broadly), the containment lane sees a burst of expedited events against substrate admission ceilings. GRANTHA has recorded this interaction as un-analyzed (audit CA-13) and assigned it to the joint cadence-design pass — flagging it now so FORAY's side of that pass expects it.
  5. Seqcommit access horizon. GRANTHA read seqcommit-accessor.md at source this session: script-visible seqcommit access is bounded to roughly a 12-hour finality window. GRANTHA's anchoring path may need to reference recent in-range anchors when a low-activity lane idles past that horizon between rare state-changes. Confirm whether FORAY's anchoring path already accounts for this, or whether it lands in the joint pass.
  6. Routing. Whether GRANTHA's stream rides a witness-pipeline discipline (accumulate / deterministic-bundle / counter continuity) or FORAY's own bundling remains IN MOTION from the Agentic ID exchange — unchanged, listed for completeness.

5. GRANTHA-side open items FORAY should know about

6. Next steps

GRANTHA's next moves are its v0.12 source read, the ratification pass, and the DSL grammar (pending an evaluator-alignment check with Boundaries). The GRANTHA↔FORAY joint item is the cadence-design pass — it needs your §4 answers (bundling parameters, expedited lane, body availability, burst behavior) and produces the containment-latency numbers both projects' guarantees quote. GRANTHA is ready for that pass as soon as FORAY's inputs exist.


DUNIN7 · GRANTHA → FORAY · cross-project status GRANTHA → FORAY — Status Update — v0.1 — 2026-07-12