Version. v0.1
Date. 2026-07-13
From. GRANTHA project.
To. FORAY project.
Carrier. Marvin Percival, DUNIN7 Operator.
Status. Cross-project acknowledgment, uncommitted. Records receipt of FORAY_TO_GRANTHA_REPLY-v0_1 (2026-07-13), closes the one item FORAY marked unverified with a live source re-check, and states what GRANTHA carries from the exchange. This discharges the GRANTHA-side acknowledgment FORAY's §5 notes as outstanding.
FORAY's reply is received and read in full. All six asks are answered at the honest level FORAY's sequencing allows; GRANTHA accepts the sequencing as stated (Gate-B production milestone → WP-1 verifier → v4.1.3 acceptance → joint cadence pass) and confirms nothing GRANTHA-side blocks it. The epistemic labeling discipline (committed / planned / unverified) is noted with approval — it matches GRANTHA's own ledger practice.
FORAY marked the seqcommit horizon unverified and asked which project owns the file. Answer, with the citation:
kaspanet/kips repository: kip-0021/seqcommit-accessor.md (master branch, raw.githubusercontent path). That is why FORAY's review of its own state found no record — it is not a DUNIN7 artifact.F blue-score units, where for deployed parameters F is the finality depth — about 12 hours of target block time. The figure stands.Operator action FORAY requested is thereby reduced to nil on this item; no source-check remains outstanding.
extension field (new requirement, accepted). GRANTHA's anchoring envelopes will carry the mandatory extension object (ext_version, ext_digest, inert at v4.1.3) once v4.1.3 is accepted. Recorded as a schema delta against GRANTHA_FORAY_ANCHORING_DECISION-v0_2 §3a — the anchoring decision revises to v0.3 when v4.1.3's final shape exists, not before. Thanks for flagging ahead of integration.direct envelope path. GRANTHA notes this recording with approval; it is precisely the demand signal the dual-cadence recommendation intended to create. GRANTHA will supply the containment lane's latency requirement to the direct/batched decision as soon as the G6-side number exists (still unheld — a Stele-side ask, tracked GRANTHA-side)._refs[] as a first-class shape, and FORAY's independent endorsement of the Arrangement-chain rejection. The interface in the status update stands as proposed, adoption still queued for Operator ratification (unchanged).foray-api repo gap as the concrete unblock and will not design against the endpoint until it exists.
The GRANTHA↔FORAY interface is in its best state to date: schema confirmed valid under committed v4.1.2, the one unverified claim resolved with a public citation, every open item either assigned to a named future event (v4.1.3 acceptance, the joint pass, the foray-api repo) or held with an honest label. Nothing is silently pending. GRANTHA's next contribution to the seam is the containment-latency requirement (blocked on Stele's G6 number) and Operator ratification of the adoption sheet; FORAY's is the sequence its reply names. The joint cadence pass convenes when FORAY's items 2 and 3 exist.
DUNIN7 · GRANTHA → FORAY · cross-project acknowledgment GRANTHA → FORAY — Acknowledgment of Reply v0.1 — v0.1 — 2026-07-13