Loomworks — Stele Phase 7 P7-3 CR-Drafting Handoff — v0.1

Version. 0.1 Date. 2026-06-19 Author. Marvin Percival (DUNIN7 Operator) with Claude.ai (scoping) on DUNIN7-M4. For. A fresh Claude.ai chat — the CR-drafting role. This chat's product is the P7-3 change request: the final Stele Phase 7 slice — the ceremony lift + the reference app + browser ceremony + config generator + docs. Status. CR-drafting handoff. Both P7-3 forks are resolved (lift + env-scaffolding). This chat drafts the P7-3 CR only. Markdown primary (technical consumer / next-session orientation).


Plain-language summary

What this chat does. Drafts the P7-3 CR — the final Phase 7 slice that takes Stele to the clone-and-run-and-use bar. Five deliverables: (1) lift the add-passkey ceremony into stele.webauthn (dissolving the P7-2 asymmetry — a clean extraction, not a split); (2) a standalone reference app that mounts stele.router; (3) the browser WebAuthn ceremony closing the ceremony-gap; (4) an env-scaffolding config generator; (5) docs. Both forks are resolved going in — this chat does not re-open them.

The state going in (settled — do not re-establish).


Read first (this chat's orientation, in order)

All in loomworks-record:

  1. This handoff — the frame.
  2. The P7-3 scoping note (...-p7-3-scoping-note-v0_1.md) — the commitment frame. The five deliverables, both resolved forks with their trajectory, the two §D decisions to make at the CR's Step 0, the sequencing (lift first), what's held out.
  3. The P7-3 Step 0 inspection report (...-p7-3-step-0-inspection-report-v0_1.md, record 45ac2f1) — the ground. §A (the persons/signup.py tangle — the clean-extraction facts the lift rests on), §B (the live mount surface — 8 routes, 9 slots, SDK/mount/delivery mechanics), §C (what a real mount requires — the config-gen sizing), §D (reference-app shape signals — Postgres/JSONB, browser front, login-as-host-composition, the TOTP-verify gap).
  4. The P7-2 completion record (...-p7-2-completion-record-v0_1.md) — the as-built floor: the injection contract, the §4 asymmetry named as correction-in-waiting (which this CR dissolves), the banked lessons.
  5. CR-2026-115 v0.2 (change-requests/cr-2026-115-...-v0_2.md) — the P7-2 CR this CR's lift amends (the asymmetry-dissolution record — decide a forward-note vs a 115 v0.3).
  6. The seed (loomworks-candidate-seed-v0_12.md) — the authentication framework (no email as identity) and authorization substrate (Stele authenticates, host authorizes). The reference app's login composition must honor both.
  7. The current-status manifest (current-status-manifest-v0_67.md) — live state.

What the P7-3 CR must commit to

The CR drafts the five deliverables from the scoping note + inspection report, opening with its own Step-0-of-the-CR grounding pass (CC re-confirms the lift's clean-extraction facts against live code, and resolves the two §D decisions + the store-slot fate against the live surface, before committing to the build).

The CR's Step 0 must resolve:

The build sequence the CR commits:

  1. The lift (both repos, add-and-verify, engine suite green) — first, because it shrinks the slot set.
  2. Reference app + browser ceremony + config gen.
  3. Docs.
  4. Record (completion + manifest + the 115 asymmetry-dissolution).

Standing disciplines to carry in


The CR-number question (resolve at draft time)

P7-3 is likely CR-2026-116 (P7-2 was 115). Confirm against the live ledger at draft time — CC checks the highest cr-2026-NNN in change-requests/; don't assume from this handoff.


The arc from here

  1. This chat drafts the P7-3 CR (with its own Step-0 grounding pass + the two §D resolutions).
  2. CC executes, slice by slice, inspect-first, halt-before-push, two-repo add-and-verify (the lift first).
  3. P7-3 closes Phase 7. After it: the published-package path and the CR-2026-102 SCOPE_TOTP thread remain as parked, walkable threads — not Phase 7.

Two-role division holds: CR-drafting (this fresh chat) separate from execution (CC). Fresh chat per role.


Open items riding alongside (not P7-3 blockers)