Phase 57 CR — Marketing Engagement Creation

CR number. CR-2026-090 Version. 0.2 Date. 2026-05-12 Status. Amendment cycle 1; supersedes v0.1. Target tag. phase-57-marketing-engagement-creation (annotated; engine + Operator Layer). Authoritative inputs. loomworks-phase-57-scoping-note-v0_2.md; loomworks-phase-57-cr-drafting-handoff-v0_1.md; phase-57-step-0-findings-v0_1.md (engine repo docs/phase-impl-notes/, on branch phase-57-step-0 at 69adb17); current-status-manifest-v0_41.md. Amendment-cycle inputs added at v0.2: phase-57-halt-surface-2026-05-12-v0_1.md (engine repo docs/phase-impl-notes/ on branch phase-57-marketing-engagement-creation at a00f4a3; also in project knowledge); loomworks-phase-57-cr-amendment-scoping-note-v0_1.md; loomworks-phase-57-cr-amendment-handoff-v0_1.md. Precedent CRs: Phase 56 (phase-56-cr-conversational-creation-surface-voice-v0_2.md), Phase 55 (phase-55-cr-engagement-creation-assistance-v0_1.md), and for CR-version-bump shape: phase-49-cr-amendment-v0_2-v0_1.md. Drafter posture. Drafted by Claude.ai per amendment handoff §12 kickoff. Eight CR-time verifications (CRV-1 through CRV-8) embedded as Step 0 pre-flight per Phase 53/55 precedent. Eight CR-amendment-time verifications (CRV-A1 through CRV-A8) embedded as Step 2a pre-flight per amendment handoff §8 — CC runs them against the live OL repo at amendment-execution start; naming-only divergences absorb in-flight, architectural divergences halt and surface a follow-on amendment-cycle note.

Amendment record (cycle 1, this version). Amendment cycle 1 absorbed per phase-57-halt-surface-2026-05-12-v0_1.md and loomworks-phase-57-cr-amendment-scoping-note-v0_1.md. Sub-arc 4 (OL surface alignment with engine identity contract) added; Step 2a inserted; Step 2 renamed Step 2b. OL vitest count 150 (was 149). Gate 5 amended; Gate 5b new (subsequent gates renumbered with +1 offset). One reserved buffer slot consumed (one remains). Engine substrate unchanged. Three methodology candidates (A + B + C) carry to v0.21 / v0.42. One queued direction added (OL surface-vs-contract audit, Phase 58+). Two minor accuracy fixes within sections the handoff §7.2 labeled "Unchanged" recorded in §4 discovery-record bookkeeping (§13 OL bullet; §17 OL close expected-vitest comment); both fixes correct factual claims about post-amendment OL state.


§1 Purpose

Phase 57 ships the first real-Operator usage of the Phase 55/56 conversational engagement creation surface. The marketing engagement (sibling to the Loomworks engagement under DUNIN7) is created live by the Operator using pre-drafted content from loomworks-marketing-creation-flow-content-v0_3.md and the Discovery-record terminal-turn path.

The phase has two outputs:

  1. Product output. The marketing engagement exists as a real Loomworks engagement — Discovery record in Memory, candidate seed produced via Phase 53 extraction, induction loop closed, engagement visible in the /operator engagement list.
  2. Methodology output. A real-Operator transcript captured as a calibration fixture at tests/fixtures/voice-calibration/real_operator_marvin_<YYYY-MM-DD>.md. First concrete instance of the persona-vs-real-Operator-contrast pattern named at scoping v0.1 §12.

One substrate addition closes the only known gap on the creation surface: the Field 6 per-field elicitation prompt component. The substrate is otherwise complete — Seed.additional_assertions: dict[str, str] exists, Phase 53's extraction skill parses Field 6, and the skill validates the structure. The gap is elicitation-only (V2 GAP-CONFIRMED-AS-EXPECTED at Step 0).

Amendment cycle 1 (v0.2) adds Sub-arc 4 — OL surface alignment with engine identity contract — to absorb the halt-surface finding that the Operator Layer signin form's empty-email guard contradicts the engine's WebAuthn discoverable-credential identity contract and the standing DUNIN7 principle that email must not be used for identity. The fix is OL-side only; engine substrate is correct and untouched. Phase 57's product + methodology deliverables are preserved unchanged.


§2 Background

Phase 55 (phase-55-engagement-creation-assistance) shipped the conversational creation surface — intent classifier, dispatcher routing, three scaffolding prompt templates (create_engagement_active.md, create_engagement_commit.md, intent_classifier.md), field_coverage map, terminal-turn affordance.

Phase 56 (phase-56-conversational-creation-surface-voice) voice-tuned that surface with plain-terms-discipline: three per-field elicitation prompts at prompts/intent_instructions/create_engagement/ (voice.md, constraints.md, success.md); the load_per_field_components loader at prompt_assets.py; dispatcher splice at prompt.py:817; voice principles document at docs/voice-principles-v0_1.md; persona calibration fixtures at tests/fixtures/voice-calibration/; calibration-gated tests at tests/test_phase_56_conversational_creation_surface_voice.py with helper at tests/helpers/voice_calibration.py; terminal-turn matcher token-set in router.py covering legacy + plain-terms phrasings.

Phase 57 closes the Field 6 gap (Phase 56 explicitly scoped Fields 3–5 only) and exercises the surface end-to-end on a real engagement for the first time.

Substrate baseline (from handoff §2; CC re-confirms at Step 0).

Engine repo DUNIN7/loomworks-engine at /Users/dunin7/loomworks-engine:

Operator Layer repo DUNIN7/loomworks at /Users/dunin7/loomworks:

Marketing site repo: not in Phase 57 scope. Workshop repo: not in Phase 57 scope.

Substrate baseline at amendment-cycle-1 start (post-halt, pre-resume; per amendment handoff §2).

Engine repo on branch phase-57-marketing-engagement-creation at a00f4a3 — CR archive commit + Field 6 substrate commit from Step 0 + Step 1; 2,280 always-run + 32 skipped (1 always-run + 2 calibration-gated added at Step 1); Alembic 0064 unchanged; working tree clean; halt-surface note filed at docs/phase-impl-notes/phase-57-halt-surface-2026-05-12-v0_1.md on the branch.

Operator Layer repo on branch phase-57-marketing-engagement-creation at 2cc0ebc (= Phase 56 commit; no OL changes yet — the amendment changes this); 149 vitest; 11 prerendered routes; lint/tsc/build clean; working tree clean.

Local stack at amendment-resume time: engine API up on :8000 with /healthz returning 200; CORS resolved (LOOMWORKS_ENV=development in local .env); OL dev server up on :3001; Marvin's Person row + passkey credential present in dev DB.

Halt-surface trajectory leading to amendment cycle 1 (per phase-57-halt-surface-2026-05-12-v0_1.md). Step 2 entry surfaced an architectural finding: the Operator Layer signin form at /operator/create-engagement (which redirects to /signin when unauthenticated) presents a required-email field. The Operator named a long-standing DUNIN7 principle — email must not be used for identity; email-hijack creates account-takeover via password-reset-to-email — that was not previously named in any source-of-truth document. CC's diagnostic established three findings against the live source on branch phase-57-marketing-engagement-creation: (1) the engine identity model is WebAuthn passkey — SignupBeginRequest, LoginBeginRequest, PersonRow all treat email as Optional; /auth/login/complete looks up the Person by credential_id not by email; the discoverable-credential flow is supported when email = None on /auth/login/begin; (2) the OL signin form's client-side gate at IdentifierStep.tsx:31 contradicts the engine contract by requiring email input where the engine does not — signin-flow.ts:42 POSTs {email: email.trim()} and the engine would accept {} cleanly; (3) the drift was not surfaced at Phase 41 / 48 / 50 close because the standing principle was not named in any source-of-truth document. The engine correctly embodies the standing principle; the contradiction is at the OL client-side gate only; the fix is OL-side and small.


§3 Construction decisions (P57-D1 through P57-D10)

All ten settled at scoping v0.2 (eight items) plus handoff (two items: D7 elevation to Option A, and D10 newly added at v0.2). CC executes against them; does not re-decide.

| Item | Setting | Source | |------|---------|--------| | P57-D1 | Shape B — usage event with bounded substrate tuning (one prompt component at Step 1). | Scoping v0.2 §Shape selection | | P57-D2 | Stop at engagement-exists. Downstream marketing-engagement substrate (render specialists, marketing-shaped artifacts, marketing-engagement-specific assertion types) is Phase 58+. | Scoping v0.2 §Open construction decisions | | P57-D3 | Discovery-record terminal-turn path. Not the brief-commit path. | Scoping v0.2 §Open construction decisions | | P57-D4 | Author Field 6 prompt at Step 1. New file at prompts/intent_instructions/create_engagement/additional_assertions.md; ~11 lines; structural mirror of Phase 56's voice.md / constraints.md / success.md; +1 test. | Scoping v0.2 §Open construction decisions | | P57-D5 | Real-Operator transcript fixture at tests/fixtures/voice-calibration/real_operator_marvin_<YYYY-MM-DD>.md. Filename distinguishes from persona fixtures. Date is literal Step 2 capture date. | Scoping v0.2 §Open construction decisions | | P57-D6 | Closed. Field 6 surface fallback design no longer needed since Shape B confirmed and Step 1 lands the elicitation prompt directly. | Scoping v0.2 §Open construction decisions | | P57-D7 | Option A — delete at close. Step 0 inspection branches are deleted at phase close. Phase 57 applies retroactively: phase-56-step-0 is also deleted at Phase 57 close. Going-forward convention: every phase deletes its Step 0 inspection branch at close. (The silent cleanup of phase-55-step-0 between Phase 56 close and Phase 57 Step 0 demonstrated Option A is the natural drift; Option A formalizes it.) | Handoff §4 (elevated from v0.2 Option B provisional) | | P57-D8 | Independent engagement under DUNIN7. Marketing engagement is sibling of the Loomworks engagement, not a subsidiary. | Scoping v0.2 §Open construction decisions | | P57-D9 | Sonnet for default Companion operation. Flagged for Phase 58+ at first-rendered-output cost surface; not a Phase 57 settled decision but recorded for downstream pickup. | Scoping v0.2 §Open construction decisions | | P57-D10 | Capture-during-Step-2-only. V4 POSTURE-GAP friction phrases captured in Step 4 implementation notes; no Step 1 posture pre-tuning. Future micro-tuning phase informed by Step 2 evidence. | Handoff §4 (added at scoping v0.2 §Open construction decisions §New at v0.2) |

§3.A Amendment cycle 1 — P57-A1 through P57-A10

All ten amendment-cycle-1 construction decisions settled at the amendment scoping note (loomworks-phase-57-cr-amendment-scoping-note-v0_1.md). CC executes against them; does not re-decide.

| Item | Setting | Source | |------|---------|--------| | P57-A1 | Remove the empty-email guard; omit email from /auth/login/begin POST body when empty; update field surface text to indicate optionality. Email field stays present (narrows allowCredentials as a passkey hint when supplied); the discoverable-credential path is the normal path. | Amendment scoping note §P57-A1 | | P57-A2 | One new vitest. Exercises empty-email submission → no emailEmptyError set → POST body omits email → mock returns a WebAuthn challenge → form transitions to the passkey step. Rejected alternatives: zero tests (regression-prone for a client-side gate); two tests (the with-email path is already covered by existing 149). | Amendment scoping note §P57-A2 | | P57-A3 | Narrow audit limited to the signin form only. Sign-up, claim-flow, account-recovery, and other identity-adjacent OL surfaces deliberately out of amendment scope. OL surface-vs-contract audit queued as a Phase 58+ candidate. | Amendment scoping note §P57-A3 | | P57-A4 | Public marketing form out of scope. The Phase 51 form takes email + jurisdiction as contact metadata for grant-request intake; the grant flows through Companion-as-Authority approval (Phase 50), not through email-keyed authentication. Principle distinguishes identity from contact. CRV-A7 verifies HOLDS at amendment-execution time; expected verdict HOLDS. | Amendment scoping note §P57-A4 | | P57-A5 | CR version phase-57-cr-marketing-engagement-creation-v0_2.md. v0.1 preserved alongside as superseded; both archived at engine repo docs/phase-crs/. | Amendment scoping note §P57-A5 | | P57-A6 | New Sub-arc 4: OL surface alignment with engine identity contract. Separate sub-arc keeps the engine / OL boundary visible. Rejected alternative: Sub-arc 1e extension of Field 6 prompt authoring (would muddy the engine / OL boundary). | Amendment scoping note §P57-A6 | | P57-A7 | Test count update: OL vitest 149 → 150. Engine 2,280 always-run + 32 skipped unchanged. Alembic 0064 unchanged. | Amendment scoping note §P57-A7 | | P57-A8 | Two CR §12 gate updates. Gate 5 amended to include Sub-arc 4 readiness. New Gate 5b: OL signin surface accepts empty email and proceeds to the WebAuthn discoverable-credential path. Subsequent gates renumbered with +1 offset. Total gates 17 → 18. | Amendment scoping note §P57-A8 | | P57-A9 | Three methodology candidates carry to v0.21 / v0.42. Candidate A (engine-correct-surface-drifted); Candidate B (standing-principle-not-named-in-source-of-truth-documents-allows-contradicting-surface-to-ship); Candidate C (new at amendment scoping — substrate-friction-discipline-pattern-second-build-mode-firing, two-instance evidence: Phase 49 Step 4 + Phase 57 Step 2). | Amendment scoping note §P57-A9 | | P57-A10 | One reserved buffer slot consumed. One remains available if Steps 2b–5 surface a second halt-and-amend cycle. First consumed reserved slot since Phase 49 Step 4; eight consecutive zero-consumption phases (50–56 + Phase 57 pre-halt) ended at this amendment. | Amendment scoping note §P57-A10 |


§4 Trajectory worth preserving

Discovery-record posture: positions named alongside corrections; alternatives that didn't fire preserved.

Position 1 — Pre-scoping. Phase 32 (the marketing engagement) was the first-line recommendation in both Phase 55 close handoff §9 and Phase 56 close handoff §9. Two consecutive close-handoff recommendations.

Position 2 (v0.1) — Recommendation Candidate I, Shape B. Phase 32 framed as a usage event with bounded substrate tuning. The Field 6 elicitation gap surfaced as the probable Step 0 finding that would drive the "bounded tuning" envelope. Calibration capture identified as the methodology byproduct.

Reshape candidates anticipated at v0.1 → v0.2 (none fired). Operator-reframe to Shape A (pure usage); Operator-reframe to Shape C (bundled prep with §1.3 refactor candidates or Phase 31 plain-terms residue); Step 0 reshape on V2 (Field 6 gap discovered as non-gap); Step 0 reshape on V3 (multi-value handling broken); Operator-reframe to Candidate II or III. None of these reshapes fired at v0.2 absorption.

Position 3 (v0.2) — Confirmatory narrowing; Shape B settled. Step 0 returned State 2 / no halt-condition firings: V0 HOLDS-WITH-DRIFT (two items absorbed as methodology candidates); V1 HOLDS (surface inventory matches manifest v0.41 §1); V2 GAP-CONFIRMED-AS-EXPECTED (Field 6 elicitation absent as predicted); V3 MULTI-VALUE-ACCEPTED (the surface elicits multi-value fields cleanly); V4 POSTURE-GAP minor (the pre-drafted-content posture surfaces minor friction worth capturing but not pre-tuning); V5 HOLDS (Discovery-record terminal-turn path clean); V6 HOLDS (marketing v0.3 content maps cleanly to Fields 1–6); V7 HOLDS (Phase 31 plain-terms residue isolated; doesn't bite Phase 32); V8 HOLDS (OL surface renders). The substrate-evidence-can-re-rationalize-selection pattern did not fire — v0.1 framing was on-target. The trajectory shape is confirmatory narrowing, not reshape. Worth recording as the baseline against which reshape trajectories stand out.

Position 4 (v0.2) — Two methodology candidates surfaced incidentally to V0.

Position 5 (handoff) — P57-D7 elevated to Option A. The silent cleanup of phase-55-step-0 showed Option A is the natural drift. Option A formalizes the convention going forward and applies retroactively to phase-56-step-0 at Phase 57 close.

Carry to v0.42 manifest absorption and v0.21 methodology consolidation:

Amendment cycle 1 — How we got here

The trajectory leading to v0.2 is worth preserving in full for v0.42 manifest absorption and v0.21 methodology consolidation. This is the second build-mode firing of the substrate-friction-discipline-pattern (manifest v0.39 §2); the first such firing since Phase 49 (Step 4 → phase-49-step-4-amendment-scoping-v0_1.md → CR v0.3 → Step 4b — the canonical instance).

Position 1 (Phase 57 scoping v0.1 → v0.2 → CR-2026-090 v0_1). Phase 57 anticipated zero OL substrate changes. The CR explicitly named this at §16 test count predictions (OL vitest: 149 unchanged) and §6 (What Phase 57 does NOT deliver). Step 0 (V1–V8) verified engine-side substrate exhaustively; OL-side substrate was not Step 0's aperture because the scoping note did not anticipate OL substrate work.

Position 2 (Step 2 entry, pre-halt). Local stack readiness friction surfaced (CORS preflight 405 on OL :3001 → engine :8000). Resolved with LOOMWORKS_ENV=development added to local .env. CR §12 gate 5 (live OL stack ready) appeared met. Step 2 ready to begin. Note recorded in the halt-surface: gate 5 was met at the infrastructure layer but had not been validated at the architectural layer; the architectural validation happened only when the Operator looked at the signin surface and named the standing principle.

Position 3 (halt-surface diagnostic). Three findings against the live engine + OL source on the phase-57-marketing-engagement-creation branch:

The principle is correctly embodied in the engine; the contradiction is at the OL client-side gate only. The fix is one-line in scope.

Position 4 (this amendment). Narrow OL surface alignment scoped strictly to the signin form entry point. Sub-arc 4 added; one new build step (Step 2a) inserted before the paused Step 2 (renamed Step 2b for clarity). One vitest. Surface text updated. Engine untouched. Audit of sibling OL identity-adjacent surfaces (sign-up, claim, account recovery) queues as a Phase 58+ candidate rather than expanding amendment scope.

The four positions are preserved. Position 1 (no OL changes anticipated) is not erased by Position 4 (one OL change required). Position 1 was correct given the information accessible to Phase 57 scoping at the time; Position 4 corrects with the principle now named and the contradiction identified.

New methodology candidates at amendment cycle 1

Two from the halt-surface; one new at amendment scoping. All carry to v0.42 manifest absorption and v0.21 methodology consolidation.

Discovery-record bookkeeping at v0.2

Two minor departures from the amendment handoff §7.2 instruction recorded here for discovery-record posture, both narrow accuracy fixes within sections the handoff labeled "Unchanged."

Both fixes are within the handoff's "Unchanged" interpretation when read as the structure and the commands are unchanged; both fixes correct factual claims that strict prose preservation would render inaccurate. Recording the departures here per the discovery-record posture rather than silently re-writing.


§5 Substrate surfaces shipped

Sub-arc 1 — Field 6 elicitation prompt authoring

1a. Field 6 per-field elicitation prompt component.

1b. field_coverage map extension.

1c. Active-template scaffolding update.

1d. Test exercising new prompt component loading.

1e. (Not anticipated.) Loader extension. Only required if CRV-4 reveals the loader is hardcoded to specific keys. Default expectation per V1: loader handles arbitrary keys; no loader change needed.

Sub-arc 2 — Usage event (live conversation)

Not substrate work; Operator-paced. Documented here for CR completeness.

Sub-arc 3 — Calibration capture + observation capture

3a. Real-Operator transcript fixture.

3b. Calibration-gated tests.

3c. Implementation notes document.

Sub-arc 4 — OL surface alignment with engine identity contract (new at amendment cycle 1)

Three substantive components plus one new vitest. All OL-side. Engine substrate is correct and untouched. The work resolves the halt-surface finding: the OL signin form's client-side empty-email guard contradicts the engine's WebAuthn discoverable-credential identity contract and the standing DUNIN7 principle that email must not be used for identity.

CR-amendment-time verifications CRV-A1 through CRV-A8 (specified in §10 Step 2a pre-flight) supply exact paths, line numbers, constant locations, and existing test conventions at execution time. Where paths or constants are cited below, CC verifies them live before edits; naming-only divergences absorb in-flight; architectural divergences halt and surface a follow-on amendment-cycle note in docs/phase-impl-notes/.

4a. Signin form empty-email guard removal.

``` if (!email.trim()) { setLocalError(SIGNIN.emailEmptyError); return; } ``` Replace with: proceed to submission unconditionally (no email-required gate at the client). The engine accepts the empty-email POST cleanly per halt-surface Finding 1 and runs the WebAuthn discoverable-credential path.

4b. POST body construction.

```ts const body = email.trim() ? { email: email.trim() } : {}; ``` Exact TypeScript idiom selected at execution time within the existing file's style. Engine accepts {} cleanly per halt-surface Finding 1 — LoginBeginRequest.email: str | None = None, so an absent field and a null field are equivalent under Pydantic.

4c. Field surface text — optionality indication.

4d. Vitest pinning the corrected discoverable-credential path.

Unchanged substrate surfaces

Cited verbatim for clarity; CR does not modify these:

Engine substrate is unchanged at amendment cycle 1. Sub-arc 4 is OL-only. No engine endpoint, no engine schema, no Memory event, no _ANCHOR_PRIORITY entry, no Alembic migration. SignupBeginRequest, LoginBeginRequest, PersonRow, begin_signup, and the /auth/login/complete lookup-by-credential_id path all stay as halt-surface Finding 1 documented them.


§6 What Phase 57 does NOT deliver

Per scoping v0.2 §What Phase 57 does NOT deliver:

Added at amendment cycle 1:


§7 Test strategy

Tests must pass at Checkpoint A (substrate gate, extended at amendment cycle 1 to cover Step 2a OL substrate) and Checkpoint B (final gate). The calibration-gated tests are confirmed to pass locally with LOOMWORKS_RUN_CALIBRATION=1 and confirmed to skip without it before close.


§8 Backwards-compatibility

Amendment cycle 1 backwards-compat summary. Existing 149 OL vitest stay green; the new vitest pins the corrected behavior; engine substrate is untouched so all engine backwards-compat carries. The OL signin form remains functionally compatible with previously-registered passkey credentials — narrowing allowCredentials via a supplied email continues to work, and the new empty-email path activates the engine's existing discoverable-credential branch. No data migration, no client-side state migration, no API contract change.


§9 FORAY hooks

No new surfaces. No new MemoryObject subclass; no new _ANCHOR_PRIORITY entry; no new endpoint. Existing FORAY surfaces (Phase 16 upload anchors; Phase 53 discovery_to_seed_extracted anchor at priority "standard"; standard induct_seed anchor) carry the Discovery-record path unchanged.

Amendment cycle 1 touches no Memory event, no _ANCHOR_PRIORITY entry, no engine endpoint, no FORAY hook. The signin path is the WebAuthn flow at the auth boundary; it does not write Memory events of its own. FORAY surfaces are unchanged at v0.2.


§10 Build steps

Six active steps + two reserved buffer slots (one consumed at amendment cycle 1; one remains). Reserved-slot-as-halt-condition-pre-commitment per manifest v0.39 §2; the eighth-consecutive zero-consumption observation projected at v0.1 is superseded — Phase 57 consumed one slot via Sub-arc 4 (Step 2a). Methodology candidate C captures this trajectory (substrate-friction-discipline-pattern-second-build-mode-firing).

Auto-mode posture: Step 0 + Step 1 auto-proceed. Checkpoint A halts before Step 2 and extends at amendment cycle 1 to cover Step 2a completion — Operator confirms substrate (Field 6) AND Sub-arc 4 fix before Step 2b live usage proceeds. Steps 2b–4 are Operator-paced (Step 2b is the live conversation; Steps 3/4 are CC capture). Checkpoint B (final) halts before tagging.

Step 0 — Pre-flight + CR archival + build branch

Status at amendment cycle 1. DONE pre-halt. CR archival path updates from v0_1 to v0_2 at amendment-execution time (CC re-archives the amended CR; preserves v0_1 alongside).

What. Standard pre-flight. CC archives this CR to engine repo at docs/phase-crs/phase-57-cr-marketing-engagement-creation-v0_2.md (preserves phase-57-cr-marketing-engagement-creation-v0_1.md alongside as superseded). Confirms baseline tags, test counts, Alembic head. Creates branch phase-57-marketing-engagement-creation from main on engine and OL repos. (Branch already exists pre-amendment-resume; CC re-archives the CR on the existing branch.)

Pre-flight reads. CR-time deltas — exact strings, file paths, signatures, naming conventions that scoping-time Step 0 didn't enumerate and that the CR drafter could not verify from Claude.ai. CC runs these against the live engine repo. Naming-only divergences absorb in-flight; architectural divergences halt and surface a phase-57-halt-surface-<timestamp>-v0_1.md note in docs/phase-impl-notes/.

CR archival. Copy this CR file to engine repo docs/phase-crs/phase-57-cr-marketing-engagement-creation-v0_2.md (preserving v0_1 alongside as superseded).

Branch creation. git checkout -b phase-57-marketing-engagement-creation on engine and OL (already in place at amendment-cycle-1 resume).

Mode posture. Auto-proceed.

Acceptance gate. All eight CRV verdicts captured. Branch present on both repos. CR archived (v0_2 alongside v0_1). Baseline tag + test counts + Alembic head confirmed against handoff §2.

Halt threshold. Any CRV produces an architectural divergence (not naming-only) → halt-surface note + Operator-elective amendment cycle in a fresh Claude.ai chat. Baseline divergence (test count off by more than ±2 routine noise; Alembic head different; working tree dirty; tag missing) → halt before any further work.

Time. ~10 min.

Step 1 — Field 6 prompt authoring (sub-arc 1)

Status at amendment cycle 1. DONE pre-halt. Engine substrate at a00f4a3 on the build branch; +1 always-run test added (2,280 always-run total); +1 calibration-gated and +1 additional gated test (32 skipped total) per the halt-surface §6 state-at-halt record.

What. Author additional_assertions.md per 1a. Extend field_coverage map per 1b. Update active-template per 1c. Add +1 test per 1d.

Build.

Tests. +1 always-run.

Mode posture. Auto-proceed.

Acceptance gate. New prompt file present at the specified path with ~11 lines following Phase 56 structural shape. field_coverage map carries the new entry. Active-template Companion-judgement site references Field 6. New test green. Existing 2,279 tests still green. Lint clean.

Halt threshold.

Checkpoint A (extended at amendment cycle 1). Originally halted before Step 2 live usage to confirm Field 6 substrate. At amendment cycle 1 the checkpoint extends to also cover Step 2a (Sub-arc 4 fix). Live OL stack readied for Step 2b entry: /operator/create-engagement accessible; banner revision (Phase 56 ChatView.tsx:254) present; Sub-arc 4 fix landed; lint/tsc/build/test clean on OL including the new sign-in vitest at OL count 150.

Time. ~30 min.

Step 2a — OL signin alignment (sub-arc 4 — new at amendment cycle 1)

What. Remove the empty-email guard at the OL signin form (per Sub-arc 4a); omit the email field from the /auth/login/begin POST body when empty (per Sub-arc 4b); update field surface text (label / placeholder / helper) to indicate optionality (per Sub-arc 4c); add one vitest pinning the corrected discoverable-credential path (per Sub-arc 4d). Delete the now-orphan SIGNIN.emailEmptyError constant if no other call-sites remain.

Pre-flight reads. CR-amendment-time verifications CRV-A1 through CRV-A8 per amendment handoff §8. CC runs these against the live OL repo on branch phase-57-marketing-engagement-creation at 2cc0ebc. Naming-only divergences absorb in-flight; architectural divergences halt and surface a follow-on phase-57-halt-surface-<timestamp>-v0_1.md note in engine repo docs/phase-impl-notes/ (the OL repo does not carry impl-notes; engine repo is the methodology home).

Build.

Tests. +1 OL vitest. OL vitest count 149 → 150.

Mode posture. Auto-proceed.

Acceptance gate. All four Sub-arc 4 components landed at the verified file locations. The new vitest passes; existing 149 OL vitest still pass; lint/tsc/build clean on OL. OL vitest count 150 (was 149). Implementation notes capture the as-shipped surface-text strings and the SIGNIN.emailEmptyError constant disposition.

Halt threshold.

Checkpoint A extends. Operator confirms Sub-arc 4 fix before Step 2b live usage proceeds. Gate 5 + new Gate 5b together cover the extended Checkpoint A acceptance condition.

Time. ~30 min.

Step 2b — Live usage event (sub-arc 2; was Step 2 in v0.1)

What. Operator runs the marketing engagement creation. CC ensures local stack ready, observes the conversation, captures the live conversation log for fixture creation at Step 3.

Build (Operator-paced).

Tests. 0 new (the live event is the exercise).

Mode posture. Operator-paced.

Acceptance gate. Marketing engagement live in the local engine database. Engagement appears in /operator engagement list. Discovery record visible in Memory. Candidate seed produced. Induction pass clean. Marketing v0.3 content (Fields 1–6 with eight Field-6 entries) fully reflected in the inducted seed.

Halt threshold.

Time. ~30–60 min wall time (depends on Operator pace).

Step 3 — Calibration capture (sub-arcs 3a + 3b)

What. CC files the real-Operator transcript fixture. Adds calibration-gated tests. Runs the gated tests with LOOMWORKS_RUN_CALIBRATION=1 to confirm they pass; confirms they skip without the env var.

Build.

Tests. +1–2 calibration-gated.

Mode posture. Auto-proceed.

Acceptance gate. Fixture file present at the dated path; format mirrors persona fixtures. Gated tests green with LOOMWORKS_RUN_CALIBRATION=1. Gated tests skip in CI default mode. Total skipped count adjusts from 30 to 31–32.

Halt threshold. Real-Operator transcript capture reveals a format incompatibility with Phase 56's persona fixture format (CRV-5 failure). Halt for diagnosis.

Time. ~20 min.

Step 4 — Observation capture (sub-arc 3c)

What. CC files docs/phase-impl-notes/phase-57-implementation-notes-v0_1.md capturing trajectory, comprehension gaps, V4 friction phrases, persona-vs-real-Operator deltas, and amendment-cycle-1 observations.

Build.

Tests. 0 new.

Mode posture. Auto-proceed.

Acceptance gate. Document present at the specified path. All required sections populated, including amendment-cycle-1 sections. Carry-forward methodology candidates named (six from v0.1 + three new at v0.2: candidate A, candidate B, candidate C).

Halt threshold. None expected.

Time. ~15–20 min.

Step 5 — Close

What. Apply refined close protocol with explicit refspecs per manifest v0.41 §2. Tag phase-57-marketing-engagement-creation on both repos (annotated). Apply P57-D7 Option A retroactive cleanup: delete phase-56-step-0 locally; delete phase-57-step-0 locally after merging Step 0 findings into the build branch context.

Build (refined close protocol, both repos where applicable). See §17 for the full command sequence. Summary:

  1. Fast-forward main to phase-57-marketing-engagement-creation head.
  2. Push main to origin via git push origin refs/heads/main.
  3. Delete local build branch: git branch -d phase-57-marketing-engagement-creation.
  4. Delete remote build branch: git push origin :refs/heads/phase-57-marketing-engagement-creation (only if pushed during build).
  5. Prune remote-tracking refs: git remote prune origin.
  6. Verify Step 0 findings file present on main at docs/phase-impl-notes/phase-57-step-0-findings-v0_1.md. Then apply P57-D7 Option A:
  1. Annotate-tag: git tag -a phase-57-marketing-engagement-creation -m "Phase 57 close: marketing engagement creation" on both engine and OL repos.
  2. Push tags via explicit refspecs: git push origin refs/tags/phase-57-marketing-engagement-creation (separate invocation per repo).
  3. Verify tag landed: git ls-remote origin 'refs/tags/phase-57-marketing-engagement-creation' (separate invocation per repo).

Tests. 0 new. Final test sweep confirms all tests still green before Checkpoint B halt.

Mode posture. Auto-proceed through close-protocol mechanics; Checkpoint B halts before tagging. Operator final-confirms before tags land.

Acceptance gate. All Step 1 / Step 2a / Step 2b / Step 3 / Step 4 acceptance gates green. Working tree clean on main for both repos. Tags landed and verified on origin. phase-56-step-0 and phase-57-step-0 branches deleted locally (per P57-D7 Option A). Refined close protocol fired correctly via explicit refspecs.

Halt threshold.

Time. ~15 min.

Step 6 — Reserved buffer (consumed at amendment cycle 1)

(reserved — consumed by Sub-arc 4 work / Step 2a per P57-A10)

Phase 57's two reserved buffer slots: Step 6 consumed at amendment cycle 1 by the Sub-arc 4 budget; Step 7 remains available. Not literally a position in the build sequence — the consumption is at the budget layer; Step 2a sits earlier in the sequence chronologically. First consumed reserved slot since Phase 49 Step 4 (the canonical instance of substrate-friction-discipline-pattern); eight consecutive zero-consumption phases (50/51/52/53/54/55/56 + Phase 57 pre-halt) ended at this amendment. Per manifest v0.41 §1's observation that the no-mid-build-amendment pattern is "structural rather than coincidental," the consumption is now logged as the design intent firing correctly — slots exist to absorb mid-build amendment without derailing the phase. Methodology candidate C captures the cadence (seven-and-then-one-consumed-by-design).

Step 7 — Reserved buffer (remaining)

(reserved — buffer for any further mid-build amendment arising from steps 2b–5)

One reserved buffer slot remains, available if Steps 2b–5 surface a second halt-and-amend cycle. None anticipated. Reserved-not-skipped principle preserved; the slot's value is its presence, not its consumption.


§11 Halt conditions

Per friction-discipline-pattern-family mid-build boundary. CC halts and writes a phase-57-halt-surface-<timestamp>-v0_1.md note in engine repo docs/phase-impl-notes/ on any of:

Mid-build amendment scoping runs in a separate Claude.ai chat per the standard pattern (substrate-friction-discipline-pattern from manifest v0.39 §2 — note-first; Operator-elective amendment cycle). Amendment cycle 1 is the active instance at v0.2; further amendment cycles would consume the remaining reserved slot (Step 7) if needed.


§12 Acceptance gates

Eighteen items per scoping v0.2 §Acceptance gates plus amendment-cycle-1 amendments per P57-A8 (Gate 5 amended; new Gate 5b inserted; subsequent gates renumbered with +1 offset from old 6→7 onwards).

| # | Gate | Where verified | |---|------|---------------| | 1 | Step 0 findings absorbed; v0.2 produced; CR drafting handoff filed (already met by this CR's existence); amendment scoping note absorbed (already met by this CR's existence at v0.2). | Pre-existing | | 2 | Field 6 per-field elicitation prompt component landed at prompts/intent_instructions/create_engagement/additional_assertions.md (or final filename per CRV resolution); +1 test green. (Satisfied pre-amendment-resume at engine a00f4a3.) | Step 1 | | 3 | field_coverage map extended to include the Field 6 entry; dispatcher splice route exercised. (Satisfied pre-amendment-resume.) | Step 1 | | 4 | Active-template scaffolding at prompts/create_engagement_active.md updated for Field 6 elicitation; existing tests still green. (Satisfied pre-amendment-resume.) | Step 1 | | 5 | (Amended at amendment cycle 1.) Live OL stack ready at Step 2 entry: /operator/create-engagement accessible; banner revision present; Sub-arc 4 fix landed (see Gate 5b); lint/tsc/build/test clean on OL including the new sign-in vitest at OL count 150. | Checkpoint A (extended) | | 5b | (New at amendment cycle 1.) OL signin surface accepts empty email and proceeds to the WebAuthn discoverable-credential path. IdentifierStep.tsx empty-email guard removed; signin-flow.ts POST body omits the email field when empty; field label / placeholder / helper text indicate optionality (plain-terms-discipline, no methodology vocabulary in user-facing copy); SIGNIN.emailEmptyError constant deleted or orphaned-but-harmless per CRV-A2 resolution; new vitest pins the corrected behavior at the OL count-150 boundary. | Step 2a | | 7 | Marketing engagement created live in the local engine database via /operator/create-engagement. Engagement appears in /operator engagement list. (Was Gate 6 in v0.1; renumbered +1.) | Step 2b | | 8 | Discovery record produced and uploaded via Phase 16 pipeline; visible in Memory. (Was Gate 7 in v0.1.) | Step 2b | | 9 | Phase 53 extract_discovery_to_seed_skill produced a candidate seed against the Discovery record. (Was Gate 8 in v0.1.) | Step 2b | | 10 | induct_seed produced an induction-pass-clean Status on the marketing engagement. (Was Gate 9 in v0.1.) | Step 2b | | 11 | Marketing v0.3 content (Fields 1–6 with eight Field-6 entries) fully reflected in the inducted seed. (Was Gate 10 in v0.1.) | Step 2b | | 12 | Real-Operator transcript captured as tests/fixtures/voice-calibration/real_operator_marvin_<date>.md. Distinguished from persona fixtures by filename. (Was Gate 11 in v0.1.) | Step 3 | | 13 | ~1–2 calibration-gated tests added exercising the new fixture; gates green with LOOMWORKS_RUN_CALIBRATION=1; skip in CI by default. (Was Gate 12 in v0.1.) | Step 3 | | 14 | Phase 57 implementation notes document filed at docs/phase-impl-notes/phase-57-implementation-notes-v0_1.md carrying trajectory, comprehension-gap observations, V4 POSTURE-GAP friction phrases, persona-vs-real-Operator deltas, and amendment-cycle-1 observations (Sub-arc 4 as-shipped surface; methodology candidates A + B + C; standing-principle first-time-in-Loomworks-document record). (Was Gate 13 in v0.1.) | Step 4 | | 15 | Engine test count within v0.2 estimate (~2,280 always-run + 31–32 skipped); OL vitest count 150; lint/tsc/build clean on OL; Alembic head unchanged at 0064. (Was Gate 14 in v0.1; OL count updated at amendment cycle 1.) | Checkpoint B | | 16 | P57-D7 Option A retroactive cleanup applied: phase-56-step-0 deleted locally; phase-57-step-0 deleted locally (after findings merged forward). (Was Gate 15 in v0.1.) | Step 5 | | 17 | Refined close protocol firing on both repos via explicit refspecs (refs/heads/..., refs/tags/...). (Was Gate 16 in v0.1.) | Step 5 | | 18 | Tags phase-57-marketing-engagement-creation landed on both engine and OL repos; pushed; verified via git ls-remote origin 'refs/tags/...'. (Was Gate 17 in v0.1.) | Step 5 / Checkpoint B |

Total: 18 items (was 17 at v0.1). Gate 5b inserted between Gate 5 and old Gate 6 (now Gate 7) per the handoff §7.2 explicit instruction.


§13 Post-CR state

After Phase 57 close:


§14 Carry-forward

Per scoping v0.2 §Carry-forward inventory:

Out-of-scope (carry beyond Phase 57):

Newly enabled by Phase 57:

Added at amendment cycle 1:


§15 Kickoff prompt — paste-ready for CC (resuming at amendment cycle 1)


Resume Phase 57 build at amendment cycle 1 per CR-2026-090 v0.2
(phase-57-cr-marketing-engagement-creation-v0_2.md). v0.1 is
superseded; both are archived at engine repo docs/phase-crs/.

Baseline confirmation at amendment-cycle-1 start (post-halt, pre-resume):
- Engine repo /Users/dunin7/loomworks-engine on branch
  phase-57-marketing-engagement-creation at commit a00f4a3.
  Tests: 2,280 always-run + 32 skipped (+1 always-run / +2 calibration-gated
  added at Step 1 vs the Phase 56 baseline 2,279 / 30).
  Alembic head 0064 unchanged. Working tree clean.
  Halt-surface note present at
  docs/phase-impl-notes/phase-57-halt-surface-2026-05-12-v0_1.md.
  Step 0 findings present at
  docs/phase-impl-notes/phase-57-step-0-findings-v0_1.md.
  Step 1 substrate present at
  prompts/intent_instructions/create_engagement/additional_assertions.md.
  phase-57-step-0 branch at 69adb17 (unmerged; for P57-D7 retroactive cleanup
  at Step 5). phase-56-step-0 branch exists locally (never pushed;
  scheduled for P57-D7 Option A retroactive cleanup at Step 5).
- Operator Layer repo /Users/dunin7/loomworks on branch
  phase-57-marketing-engagement-creation at commit 2cc0ebc
  (= Phase 56 commit; no Phase 57 changes yet — Step 2a changes this).
  149 vitest passed; 11 prerendered routes; lint/tsc/build clean.
- Local stack ready (engine API up on :8000, /healthz 200, CORS resolved
  via LOOMWORKS_ENV=development in local .env; OL dev server up on :3001;
  Marvin's Person row + passkey credential present in dev DB).

Per CR §10 Step 0: re-archive this CR (v0.2) to engine repo
docs/phase-crs/phase-57-cr-marketing-engagement-creation-v0_2.md
(preserving v0_1 alongside as superseded). CRV-1 through CRV-8 ran
pre-halt at Step 0 of the original build cycle; their verdicts hold.

Per CR §10 Step 2a (new at amendment cycle 1): run CRV-A1 through
CRV-A8 as Step 2a pre-flight reads against the live OL repo on
branch phase-57-marketing-engagement-creation at 2cc0ebc.
Naming-only divergences absorb in-flight; architectural divergences
halt and surface a follow-on phase-57-halt-surface-<timestamp>-v0_1.md
note in engine repo docs/phase-impl-notes/.

Per CR §10: six active build steps (Step 0 + Step 1 done pre-halt;
Step 2a is the resumption point at amendment cycle 1; Step 2b
follows the live signin fix; Steps 3–5 unchanged from v0.1) + two
reserved buffer slots (Step 6 consumed at amendment cycle 1 by
Sub-arc 4 work; Step 7 remains available if Steps 2b–5 surface
a second halt-and-amend cycle).

Per CR §10: auto-mode posture — Step 2a auto-proceeds; Checkpoint A
extends to cover Step 2a (Operator confirms Sub-arc 4 fix before
Step 2b proceeds); Steps 2b–4 are Operator-paced (Step 2b is the
live conversation; Steps 3/4 are CC capture); Checkpoint B (final)
halts before tagging.

Per CR §3 + §3.A: ten construction decisions P57-D1 through P57-D10
plus ten amendment-cycle-1 decisions P57-A1 through P57-A10 are
settled. CC executes against them; does not re-decide.

Per CR §11: halt-and-surface is preferred to draft-and-hope. Halt
thresholds at amendment cycle 1: CRV-A architectural divergence at
Step 2a; any Sub-arc 4 component (4a/4b/4c/4d) surfaces unexpected
drift; OL vitest count diverges beyond ±1 from 150; IdentifierStep.tsx
or signin-flow.ts already changed since halt-surface diagnostic time;
CRV-A7 CONTRADICTED (Phase 51 marketing form keys off email-as-identity,
which would re-open amendment scope); signin still fails despite
Sub-arc 4 at Step 2b (would indicate deeper engine-side issue);
Operator's live conversation surfaces friction the Field 6 prompt
can't resolve; Discovery-record terminal-turn cascade fails; marketing
v0.3 content reveals a Field-mapping mismatch; persona fixture format
incompatibility at Step 3; test-count divergence greater than 50%.

Per CR §17: refined close protocol with explicit refspecs (manifest
v0.41 §2). P57-D7 Option A retroactive cleanup applied at Step 5
(delete phase-56-step-0 + phase-57-step-0 locally after findings
merged forward).

Tag name: phase-57-marketing-engagement-creation. Annotated. Lands
on both engine and OL repos at Checkpoint B (final).

Begin at Step 2a (Sub-arc 4 OL signin alignment). CRV-A1 through
CRV-A8 first, then the four Sub-arc 4 components (4a/4b/4c/4d),
then await Operator confirmation at the extended Checkpoint A
before Step 2b live usage.

§16 Test count predictions

| Surface | Pre-Phase-57 | Phase-57 delta (v0.1) | Phase-57 delta (v0.2 amendment) | Post-Phase-57 | |---------|-------------|----------------------|--------------------------------|--------------| | Engine always-run | 2,279 | +1 | 0 | ~2,280 | | Engine skipped (calibration-gated) | 30 (= 26 pre-P56 + 4 P56-gated) | +1 to +2 | 0 | 31–32 | | OL vitest | 149 | 0 | +1 (Sub-arc 4d) | 150 | | Alembic migration head | 0064 | 0 | 0 | 0064 | | Prerendered OL routes | 11 | 0 | 0 | 11 |

Existing 2,279 substrate tests stay green throughout build. Calibration-gated tests pass with LOOMWORKS_RUN_CALIBRATION=1; skip in CI by default per P56-D7 precedent. Amendment cycle 1 adds +1 OL vitest exercising the empty-email discoverable-credential path; all 149 existing OL vitest stay green.


§17 Refined close protocol script

Aligned with Phase 56 CR-2026-080 v0.2 §3.1 close-protocol refinement and manifest v0.41 §2 named principle (explicit refspecs). Executed at Step 5 by CC; Checkpoint B halts before tag-push for Operator final confirmation. Unchanged at amendment cycle 1 — the close-protocol commands are step-5 work; they do not depend on Sub-arc 4 specifics.

Engine repo close


cd /Users/dunin7/loomworks-engine

# 1. Confirm Step 0 findings present on main before Step 0 branch deletion
test -f docs/phase-impl-notes/phase-57-step-0-findings-v0_1.md \
  && echo "Step 0 findings present on main" \
  || { echo "ERROR: Step 0 findings missing"; exit 1; }

# 2. Confirm build branch is up-to-date with main (assuming build commits
#    were made directly on main, or were merged forward)
git status
git log --oneline -5

# 3. Confirm tests green at close
.venv/bin/pytest -q
# Expected: ~2,280 passed, 31-32 skipped

# 4. Confirm working tree clean
git status --porcelain
# Expected: empty

# 5. Push main to origin via explicit refspec
git push origin refs/heads/main

# 6. Delete local build branch (if it exists as a separate branch)
git branch | grep phase-57-marketing-engagement-creation \
  && git branch -d phase-57-marketing-engagement-creation \
  || echo "Build branch already merged or not separate"

# 7. Delete remote build branch via explicit refspec (only if pushed during build)
git ls-remote origin 'refs/heads/phase-57-marketing-engagement-creation' \
  && git push origin :refs/heads/phase-57-marketing-engagement-creation \
  || echo "Build branch not on origin; skip remote delete"

# 8. Prune remote-tracking refs
git remote prune origin

# 9. P57-D7 Option A retroactive cleanup
git branch -D phase-56-step-0
git branch -D phase-57-step-0

# 10. [CHECKPOINT B HALT — Operator final-confirms before tags land]

# 11. Create annotated tag
git tag -a phase-57-marketing-engagement-creation \
  -m "Phase 57 close: marketing engagement creation"

# 12. Push tag via explicit refspec
git push origin refs/tags/phase-57-marketing-engagement-creation

# 13. Verify tag landed on origin
git ls-remote origin 'refs/tags/phase-57-marketing-engagement-creation'

Operator Layer repo close


cd /Users/dunin7/loomworks

# 1. Confirm working tree clean (Sub-arc 4 changes already committed)
git status --porcelain
# Expected: empty

# 2. Confirm tests green
npm test -- --run
# Expected: 150 vitest passed (was 149 pre-amendment-cycle-1; +1 from Sub-arc 4d)
npm run lint
npm run tsc
npm run build
# Expected: all clean

# 3. Push main to origin via explicit refspec
git push origin refs/heads/main

# 4. [CHECKPOINT B HALT — Operator final-confirms before tags land]

# 5. Create annotated tag at the post-Step-2a OL commit
git tag -a phase-57-marketing-engagement-creation \
  -m "Phase 57 close: marketing engagement creation"

# 6. Push tag via explicit refspec
git push origin refs/tags/phase-57-marketing-engagement-creation

# 7. Verify tag landed on origin
git ls-remote origin 'refs/tags/phase-57-marketing-engagement-creation'

Explicit-refspec convention reminders (per manifest v0.41 §2)

The convention prevents the error: src refspec ... matches more than one failure mode that Phase 56 encountered and resolved in-session.


DUNIN7 — Done In Seven LLC — Miami, Florida Loomworks Phase 57 CR — Marketing Engagement Creation — v0.2 — 2026-05-12