Version. 0.1
Date. 2026-05-11
Status. Pre-CR scoping evidence brief. Hands to CC. Mirrors loomworks-phase-53-step-0-inspection-brief-v0_1.md adapted for engagement-creation-assistance surface.
Author. Claude.ai. Operator: Marvin Percival.
Companion document. loomworks-phase-55-scoping-note-v0_1.md (parent — the brief presupposes its Option A selection, its sub-arc decomposition, and its twelve P55-D items, of which four are settled at v0.1: P55-D1 = A3, P55-D3 = B3, P55-D6 = E2, P55-D12 = H1).
Pre-CR live-codebase verification for Phase 55 — conversational engagement creation surface. The scoping note records the build shape and twelve construction decisions, with four settled at v0.1 and eight on recommendations awaiting Step 0 evidence. Several decisions rest on assumptions about the Phase 42 intent classifier surface, the post-Phase-46 Operator Layer route structure, the Phase 41 personal engagement Memory shape, and the function-level call shapes of Phase 53's /seed/extract and Phase 54's /seed/converse/commit. This brief enumerates the verifications, gives CC paste-ready commands to run on DUNIN7-M4, and defines what CC produces.
CC verifies, evidence-cites, reports verdicts. CC does not propose remediation, does not edit the scoping note, does not draft the CR, does not start build.
The brief assumes the four settled P55-D items hold:
intent_hint: Literal refactor) absorbed as Phase 55 Step 1.The remaining P55-D items run on the scoping note v0.1 recommendations unless Step 0 evidence reshapes them. The brief flags which verification touches which P55-D.
Lens-bounded discipline note. Verification V1 is the cascade pre-emption — explicit enumeration of every Literal on the intent-classification surface before any classifications are added. Per manifest v0.39 §2's five-instance-amplified evidence on the lens-bounded scoping evidence cascade, the discipline is "widen enumeration aperture at Step 0 rather than carry the cascade as accepted debt." V1 is the load-bearing verification here.
CC reads in this order before starting:
loomworks-phase-55-scoping-note-v0_1.md (parent document; in project knowledge). Especially §What Phase 55 delivers; §Sub-arc decomposition; §Open construction decisions (the twelve P55-D items); §Build sequencing intent.phase-42-cr-intent-classification-and-reactive-companion-v0_1.md (engine repo docs/phase-crs/). For the intent classifier's CR-time design intent. The Phase 54 Step 0.5 V7 findings extended this; Phase 55 extends it further.phase-41-cr-companion-identity-and-personal-engagement-v0_1.md (engine repo docs/phase-crs/). For the personal engagement substrate Phase 55 reuses.phase-53-cr-discovery-to-seed-skill-v0_1.md and phase-54-cr-companion-routed-commit-v0_1.md (engine repo docs/phase-crs/). For the two extraction paths Phase 55's terminal commit calls into.loomworks-queued-directions-and-deferred-work-v0_9.md §11.1 (in project knowledge). For the intent_hint refactor framing V1 verifies.CC confirms baseline before any verification:
/Users/dunin7/loomworks-engine. Tag phase-54-companion-routed-commit at commit b933c66. Test count 2,191 passed, 26 skipped. Alembic head 0064. Working tree clean on main./Users/dunin7/loomworks. Marker tag phase-51-marketing-site-and-companion-email at e4c09e0. Vitest count 139 (manifest v0.39 records this; v0.38 recorded 128, so there's a known discrepancy — CC reports actual count). Eleven prerendered routes. eslint/tsc/build clean.Any drift from baseline → CC reports actual numbers and continues with verifications. Baseline drift is not a halt condition; baseline-vs-scoping-assumption drift is the cascade concern, captured per verification.
Ten verifications. V1 is load-bearing (cascade pre-emption); V2 through V10 are decomposition-verifying.
Framing. Phase 55 will add three new intent classifications (P55-D6 = E2). Phase 54 Step 3 caught a parallel-enumeration cascade: intent_hint: Literal on ConverseRequest duplicated classifier.IntentLabel's values, so adding a classification touched two sites instead of one. Queued directions v0.9 §11.1 names the cleanup. P55-D12 = H1 absorbs the cleanup as Phase 55 Step 1. V1 verifies the cascade surface matches v0.9 §11.1's description — and surfaces any additional parallel enumerations not yet named.
What to check.
ConverseRequest definition in the engine repo. File path and line numbers.intent_hint field present. Capture its current type annotation verbatim.classifier.IntentLabel (or whatever the canonical intent enumeration is called). File path, definition shape (Enum / Literal / class), all current values verbatim.Literal[...] containing any of the canonical intent values. Goal: find any parallel-enumeration site beyond the two named in v0.9 §11.1.Literal[...] containing values like "create_engagement", "engagement_creation", or similar — i.e. confirm no pre-existing intent name collides with Phase 55's planned additions.Deliverable. State the canonical surface (where intent names live as truth), state the parallel surfaces (where they're duplicated), give file:line for each. Verdict: cascade scope matches v0.9 §11.1, or cascade scope is larger / smaller than described.
Settles. P55-D12 details at v0.2. If the cascade is larger than estimated, Step 1's scope grows — possibly enough to halt-and-amend.
Framing. Phase 55 sub-arc 1a adds three intent classifications. The extension protocol exists (Phase 54 added two classifications); Phase 55 follows the same pattern. V2 verifies the extension surface still looks the way Phase 54 left it — registration site, per-intent handler attachment, per-intent system-prompt-component attachment.
What to check.
Deliverable. File:line for the registration site; current label list; the registration + handler + prompt-component attachment pattern, with examples from existing labels.
Settles. Confirms sub-arc 1a structure at v0.2. If the extension protocol has drifted, Step 2's substrate work reshapes.
/operator/converse route shape post-Phase-46 / Phase 54
Framing. Phase 55 sub-arc 2a's intent-classified entry (per P55-D3 = B3, the conversational entry component) routes through the existing /operator/converse endpoint family. V3 verifies that route shape and how intent_hint flows through it post-Phase-46 / Phase 54.
What to check.
/operator/converse (or whatever the current canonical converse endpoint is — Phase 46 Operator Layer rebuild may have shifted the name). File path and route definition.intent_hint parameter (or doesn't — Phase 54 may have collapsed the field if it routed everything through the classifier)./operator/converse? How does it render companion_turn events?Deliverable. Route file:line; request flow trace; UI component file:line + render pattern.
Settles. Sub-arc 2a and sub-arc 2b structure at v0.2.
Framing. Phase 55 sub-arc 1c's terminal-commit endpoint creates a new (non-personal) engagement. Phase 31 has an existing engagement-creation primitive; Phase 55 reuses it. V4 verifies the primitive's call shape and any entanglement with Phase 31's brief flow.
What to check.
Deliverable. Function file:line, signature, dependency surface, what-it-writes summary.
Settles. Sub-arc 1c structure at v0.2. If Phase 31's primitive is too entangled to reuse cleanly, reshape direction surfaces (new creation primitive vs refactor Phase 31's).
_ANCHOR_PRIORITY registry shape
Framing. Phase 55 sub-arc 1d adds a new Memory event kind engagement_created_from_assistance written to the personal engagement on terminal commit. P55-D8 proposes the schema; the event registers in _ANCHOR_PRIORITY at "standard" by analogy to Phase 53's discovery_to_seed_extracted and Phase 54's seed_committed_from_brief. V5 verifies the registry shape.
What to check.
_ANCHOR_PRIORITY registry. File path.discovery_to_seed_extracted and Phase 54's seed_committed_from_brief are present at "standard".MemoryObject subclass need to wire up to get FORAY anchoring?Deliverable. Registry file:line; full current entries; insertion-point convention; FORAY hook attachment pattern.
Settles. P55-D8 at v0.2.
/me/* route family conventions
Framing. P55-D9 proposes POST /me/engagements/create-from-conversation as the terminal-commit endpoint name. The /me/ prefix reflects that the conversation lives in the Operator's personal engagement (per P55-D4 = C1 recommendation). V6 verifies the /me/ route family conventions.
What to check.
/me/* route. File:line for each./me/* routes presumably scope to the authenticated person automatically; verify how./me/engagements/* routes already present. If the path /me/engagements/create-from-conversation would collide with an existing route, surface.Deliverable. Route list + file:line; naming-convention summary; auth/scope pattern; collision check.
Settles. P55-D9 at v0.2. Confirms or refines the proposed endpoint name.
Framing. P55-D4 = C1 places the creation conversation inside the Operator's personal engagement (Phase 41). V7 verifies the personal engagement Memory shape — that companion_turn events fit naturally on it and that the proposed terminal event engagement_created_from_assistance fits without further amendment.
What to check.
person.personal_engagement_id FK per Phase 41 CR §15)? Confirm.companion_turn events get written. Confirm they can be written to a personal engagement without special-casing.engagement_created_from_assistance event kind has no schema conflict with existing personal-engagement event patterns.
Deliverable. Personal-engagement identification pattern; companion_turn write pattern; any write-layer restrictions on personal engagements; conflict check for the new event kind.
Settles. P55-D4 (final confirmation) and P55-D8 (schema fit) at v0.2.
/seed/extract and /seed/converse/commitFraming. Phase 55's terminal-commit endpoint calls one of the two extraction paths internally (per P55-D1 = A3 — the Companion asks at terminal turn which one, then the endpoint routes). The call is function-level (not HTTP self-call). V8 verifies both paths have a callable internal entry.
What to check.
/seed/extract endpoint. File:line. Find the function-level entry point (the function the HTTP handler delegates to). Capture its signature./seed/converse/commit endpoint. File:line. Find the function-level entry point. Capture its signature.Deliverable. Two function file:line entries; both signatures; side-effect summary for each; confirmation both are callable from a sibling endpoint handler.
Settles. Sub-arc 1c routing structure at v0.2. If either path lacks a function-level entry (only HTTP-callable), reshape direction surfaces (extract function vs HTTP self-call).
Framing. P55-D3 = B3 includes a dedicated route (P55-D10 working name /operator/create-engagement). V9 verifies the Operator Layer route structure and how the new route attaches.
What to check.
/operator/* routes./operator/create-engagement involve as files and registrations?
Deliverable. Route layout; current /operator/* list; route-addition pattern; auth-wrap pattern.
Settles. P55-D10 at v0.2.
Framing. Phase 55 sub-arc 2b reuses the existing Companion conversation surface for the creation flow. Sub-arc 2c attaches a terminal-commit affordance (Companion-asks → Operator-confirm). P55-D11 = G2 attaches a subtle mode indicator. V10 verifies all three attachments.
What to check.
companion_turn events render — what's the component layer; what would be needed to add a mode indicator at the top.Deliverable. Component file:line; render layer; mode-indicator-attachment surface; terminal-turn render pattern; existing affordance pattern (if any).
Settles. Sub-arc 2b and 2c structure at v0.2; P55-D11 attachment confirmation.
For each verification, CC produces:
State classification per Phase 53 brief §5 (preserved from Phase 54):
CC produces phase-55-step-0-findings-v0_1.md in the engine repo docs/phase-impl-notes/ directory.
CC halts and surfaces (does not continue running verifications) if:
phase-54-companion-routed-commit (b933c66). Confirm baseline mismatch and stop.For all other findings, CC completes all ten verifications and produces the findings document.
CC produces a single file: phase-55-step-0-findings-v0_1.md in the engine repo at docs/phase-impl-notes/phase-55-step-0-findings-v0_1.md.
The file contains:
CC commits the findings file to the engine repo on a branch named phase-55-step-0. Does not merge. Reports the branch and commit hash back to Operator.
Operator hands the findings to Claude.ai for v0.2 absorption.
DUNIN7 — Done In Seven LLC — Miami, Florida Loomworks Phase 55 Step 0 Inspection Brief — v0.1 — 2026-05-11