DUNIN7 · LOOMWORKS · RECORD
record.dunin7.com
Status Current
Path phases/phase-55-terms-of-use/loomworks-phase-55-step-0-inspection-brief-v0_1.md

Loomworks — Phase 55 Step 0 Inspection Brief

Version. 0.1 Date. 2026-05-11 Status. Pre-CR scoping evidence brief. Hands to CC. Mirrors loomworks-phase-53-step-0-inspection-brief-v0_1.md adapted for engagement-creation-assistance surface. Author. Claude.ai. Operator: Marvin Percival. Companion document. loomworks-phase-55-scoping-note-v0_1.md (parent — the brief presupposes its Option A selection, its sub-arc decomposition, and its twelve P55-D items, of which four are settled at v0.1: P55-D1 = A3, P55-D3 = B3, P55-D6 = E2, P55-D12 = H1).


1. What this is

Pre-CR live-codebase verification for Phase 55 — conversational engagement creation surface. The scoping note records the build shape and twelve construction decisions, with four settled at v0.1 and eight on recommendations awaiting Step 0 evidence. Several decisions rest on assumptions about the Phase 42 intent classifier surface, the post-Phase-46 Operator Layer route structure, the Phase 41 personal engagement Memory shape, and the function-level call shapes of Phase 53's /seed/extract and Phase 54's /seed/converse/commit. This brief enumerates the verifications, gives CC paste-ready commands to run on DUNIN7-M4, and defines what CC produces.

CC verifies, evidence-cites, reports verdicts. CC does not propose remediation, does not edit the scoping note, does not draft the CR, does not start build.

The brief assumes the four settled P55-D items hold:

The remaining P55-D items run on the scoping note v0.1 recommendations unless Step 0 evidence reshapes them. The brief flags which verification touches which P55-D.

Lens-bounded discipline note. Verification V1 is the cascade pre-emption — explicit enumeration of every Literal on the intent-classification surface before any classifications are added. Per manifest v0.39 §2's five-instance-amplified evidence on the lens-bounded scoping evidence cascade, the discipline is "widen enumeration aperture at Step 0 rather than carry the cascade as accepted debt." V1 is the load-bearing verification here.


2. Reading order before running

CC reads in this order before starting:

  1. loomworks-phase-55-scoping-note-v0_1.md (parent document; in project knowledge). Especially §What Phase 55 delivers; §Sub-arc decomposition; §Open construction decisions (the twelve P55-D items); §Build sequencing intent.
  2. phase-42-cr-intent-classification-and-reactive-companion-v0_1.md (engine repo docs/phase-crs/). For the intent classifier's CR-time design intent. The Phase 54 Step 0.5 V7 findings extended this; Phase 55 extends it further.
  3. phase-41-cr-companion-identity-and-personal-engagement-v0_1.md (engine repo docs/phase-crs/). For the personal engagement substrate Phase 55 reuses.
  4. phase-53-cr-discovery-to-seed-skill-v0_1.md and phase-54-cr-companion-routed-commit-v0_1.md (engine repo docs/phase-crs/). For the two extraction paths Phase 55's terminal commit calls into.
  5. loomworks-queued-directions-and-deferred-work-v0_9.md §11.1 (in project knowledge). For the intent_hint refactor framing V1 verifies.
  6. This brief.

3. Substrate baseline

CC confirms baseline before any verification:

Any drift from baseline → CC reports actual numbers and continues with verifications. Baseline drift is not a halt condition; baseline-vs-scoping-assumption drift is the cascade concern, captured per verification.


4. The verifications

Ten verifications. V1 is load-bearing (cascade pre-emption); V2 through V10 are decomposition-verifying.

V1 — Literal-typed enumeration aperture (cascade pre-emption)

Framing. Phase 55 will add three new intent classifications (P55-D6 = E2). Phase 54 Step 3 caught a parallel-enumeration cascade: intent_hint: Literal on ConverseRequest duplicated classifier.IntentLabel's values, so adding a classification touched two sites instead of one. Queued directions v0.9 §11.1 names the cleanup. P55-D12 = H1 absorbs the cleanup as Phase 55 Step 1. V1 verifies the cascade surface matches v0.9 §11.1's description — and surfaces any additional parallel enumerations not yet named.

What to check.

Deliverable. State the canonical surface (where intent names live as truth), state the parallel surfaces (where they're duplicated), give file:line for each. Verdict: cascade scope matches v0.9 §11.1, or cascade scope is larger / smaller than described.

Settles. P55-D12 details at v0.2. If the cascade is larger than estimated, Step 1's scope grows — possibly enough to halt-and-amend.


V2 — Phase 42 intent classifier extension surface

Framing. Phase 55 sub-arc 1a adds three intent classifications. The extension protocol exists (Phase 54 added two classifications); Phase 55 follows the same pattern. V2 verifies the extension surface still looks the way Phase 54 left it — registration site, per-intent handler attachment, per-intent system-prompt-component attachment.

What to check.

Deliverable. File:line for the registration site; current label list; the registration + handler + prompt-component attachment pattern, with examples from existing labels.

Settles. Confirms sub-arc 1a structure at v0.2. If the extension protocol has drifted, Step 2's substrate work reshapes.


V3 — /operator/converse route shape post-Phase-46 / Phase 54

Framing. Phase 55 sub-arc 2a's intent-classified entry (per P55-D3 = B3, the conversational entry component) routes through the existing /operator/converse endpoint family. V3 verifies that route shape and how intent_hint flows through it post-Phase-46 / Phase 54.

What to check.

Deliverable. Route file:line; request flow trace; UI component file:line + render pattern.

Settles. Sub-arc 2a and sub-arc 2b structure at v0.2.


V4 — Engagement creation primitive

Framing. Phase 55 sub-arc 1c's terminal-commit endpoint creates a new (non-personal) engagement. Phase 31 has an existing engagement-creation primitive; Phase 55 reuses it. V4 verifies the primitive's call shape and any entanglement with Phase 31's brief flow.

What to check.

Deliverable. Function file:line, signature, dependency surface, what-it-writes summary.

Settles. Sub-arc 1c structure at v0.2. If Phase 31's primitive is too entangled to reuse cleanly, reshape direction surfaces (new creation primitive vs refactor Phase 31's).


V5 — FORAY _ANCHOR_PRIORITY registry shape

Framing. Phase 55 sub-arc 1d adds a new Memory event kind engagement_created_from_assistance written to the personal engagement on terminal commit. P55-D8 proposes the schema; the event registers in _ANCHOR_PRIORITY at "standard" by analogy to Phase 53's discovery_to_seed_extracted and Phase 54's seed_committed_from_brief. V5 verifies the registry shape.

What to check.

Deliverable. Registry file:line; full current entries; insertion-point convention; FORAY hook attachment pattern.

Settles. P55-D8 at v0.2.


V6 — /me/* route family conventions

Framing. P55-D9 proposes POST /me/engagements/create-from-conversation as the terminal-commit endpoint name. The /me/ prefix reflects that the conversation lives in the Operator's personal engagement (per P55-D4 = C1 recommendation). V6 verifies the /me/ route family conventions.

What to check.

Deliverable. Route list + file:line; naming-convention summary; auth/scope pattern; collision check.

Settles. P55-D9 at v0.2. Confirms or refines the proposed endpoint name.


V7 — Personal engagement Memory shape

Framing. P55-D4 = C1 places the creation conversation inside the Operator's personal engagement (Phase 41). V7 verifies the personal engagement Memory shape — that companion_turn events fit naturally on it and that the proposed terminal event engagement_created_from_assistance fits without further amendment.

What to check.

Deliverable. Personal-engagement identification pattern; companion_turn write pattern; any write-layer restrictions on personal engagements; conflict check for the new event kind.

Settles. P55-D4 (final confirmation) and P55-D8 (schema fit) at v0.2.


V8 — Internal-call shapes for /seed/extract and /seed/converse/commit

Framing. Phase 55's terminal-commit endpoint calls one of the two extraction paths internally (per P55-D1 = A3 — the Companion asks at terminal turn which one, then the endpoint routes). The call is function-level (not HTTP self-call). V8 verifies both paths have a callable internal entry.

What to check.

Deliverable. Two function file:line entries; both signatures; side-effect summary for each; confirmation both are callable from a sibling endpoint handler.

Settles. Sub-arc 1c routing structure at v0.2. If either path lacks a function-level entry (only HTTP-callable), reshape direction surfaces (extract function vs HTTP self-call).


V9 — Operator Layer post-Phase-46 route structure

Framing. P55-D3 = B3 includes a dedicated route (P55-D10 working name /operator/create-engagement). V9 verifies the Operator Layer route structure and how the new route attaches.

What to check.

Deliverable. Route layout; current /operator/* list; route-addition pattern; auth-wrap pattern.

Settles. P55-D10 at v0.2.


V10 — Companion conversation UI surface in the Operator Layer

Framing. Phase 55 sub-arc 2b reuses the existing Companion conversation surface for the creation flow. Sub-arc 2c attaches a terminal-commit affordance (Companion-asks → Operator-confirm). P55-D11 = G2 attaches a subtle mode indicator. V10 verifies all three attachments.

What to check.

Deliverable. Component file:line; render layer; mode-indicator-attachment surface; terminal-turn render pattern; existing affordance pattern (if any).

Settles. Sub-arc 2b and 2c structure at v0.2; P55-D11 attachment confirmation.


5. Output format

For each verification, CC produces:

State classification per Phase 53 brief §5 (preserved from Phase 54):

CC produces phase-55-step-0-findings-v0_1.md in the engine repo docs/phase-impl-notes/ directory.


6. Halt conditions

CC halts and surfaces (does not continue running verifications) if:

For all other findings, CC completes all ten verifications and produces the findings document.


7. Deliverable

CC produces a single file: phase-55-step-0-findings-v0_1.md in the engine repo at docs/phase-impl-notes/phase-55-step-0-findings-v0_1.md.

The file contains:

CC commits the findings file to the engine repo on a branch named phase-55-step-0. Does not merge. Reports the branch and commit hash back to Operator.

Operator hands the findings to Claude.ai for v0.2 absorption.


DUNIN7 — Done In Seven LLC — Miami, Florida Loomworks Phase 55 Step 0 Inspection Brief — v0.1 — 2026-05-11