Version. 0.1
Date. 2026-05-10
Status. Pre-CR live-codebase verification mini-brief. Single verification. Hands to CC.
Author. Claude.ai. Operator: Marvin Percival.
Companion document. loomworks-phase-54-scoping-note-v0_2.md (parent — the brief presupposes its Reshape C absorption and P54-D7 deferral pending V7 findings).
Single-verification follow-up to loomworks-phase-54-step-0-inspection-brief-v0_1.md. V3 of Step 0 surfaced that Phase 54 routes through the Phase 42 intent classifier extension (Reshape C); the Phase 54 scoping note v0.2 settles P54-D1 (gating location = C3, Companion-asks) and surfaces P54-D7 (intent classification names) + P54-D9 (Phase 42 extension point). V7 enumerates the Phase 42 intent classifier so v0.3 settles P54-D7 against the existing naming convention.
CC verifies, evidence-cites, reports verdict. CC does not propose remediation, does not edit the scoping note, does not draft the CR, does not start build.
Trivially small in scope. ~one file path enumeration, ~one signature read, ~one structural read on the extension pattern.
CC reads in this order before starting:
loomworks-phase-54-scoping-note-v0_2.md (parent document; in project knowledge) — especially §What Phase 54 delivers, §Open construction decisions P54-D7 and P54-D9, §Step 0 V3 absorption.phase-54-step-0-findings-v0_1.md (engine repo docs/phase-impl-notes/) — V3 specifically; for context on the Phase 46 OL rebuild constraint Reshape C aligns with.phase-42-cr-intent-classification-and-reactive-companion-v0_1.md (engine repo docs/phase-crs/) — for the intent classifier's CR-time design intent (existing classification list, registration pattern, classifier surface).
Framing. Phase 54 Reshape C adds two new intent classifications to the Phase 42 classifier (per P54-D7): one for "review and commit" (routes to existing Phase 25 amend path) and one for "commit and induct" (routes to the new /seed/converse/commit endpoint). The intent classification names should follow Phase 42's existing convention so the cascade doesn't repeat (lens-bounded scoping evidence cascade caught at v0.2 with V1 and V3; V7 pre-empts the same cascade at intent-naming time). V7 enumerates Phase 42's existing intent classifications and identifies the extension point.
What to check.
src/loomworks/ somewhere — possibly in a companion or routing module. File path and line numbers for the classification surface.Evidence expected.
engagement_creation_review_and_commit + engagement_creation_commit_and_inductseed_review_before_induct + seed_commit_to_inductVerdict criteria.
CC produces phase-54-step-0_5-findings-v0_1.md at /Users/dunin7/loomworks-engine/docs/phase-impl-notes/. Single section. Verdict (HOLDS / HOLDS-with-complexity / PARTIALLY HOLDS / BREAKS / INCONCLUSIVE), evidence (file paths, line numbers, enumerated classification list, verbatim snippets), implication for scoping note (P54-D7 settlement recommendation; any additional P54-D items if extension-point complexity surfaces).
CC then tells Marvin one of three states:
CC does not propose remediation. CC does not edit the scoping note. CC does not start CR drafting. CC does not start implementation. CC reports.
Place this brief at /Users/dunin7/loomworks-engine/docs/phase-impl-notes/loomworks-phase-54-step-0_5-inspection-brief-v0_1.md. Then open a new CC session on DUNIN7-M4 and paste:
Read /Users/dunin7/loomworks-engine/docs/phase-impl-notes/loomworks-phase-54-step-0_5-inspection-brief-v0_1.md
Run V7 against the live codebase at /Users/dunin7/loomworks-engine. Phase 53
close baseline (unchanged since Step 0): tag phase-53-discovery-to-seed-skill
at 702bd34; substrate 2,164 tests passed, Alembic 0064.
Reading order before running: loomworks-phase-54-scoping-note-v0_2.md (in
project knowledge); phase-54-step-0-findings-v0_1.md (engine repo docs/phase-
impl-notes/); phase-42-cr-intent-classification-and-reactive-companion-v0_1.md
(engine repo docs/phase-crs/); this brief.
V7 is a single verification — enumerate Phase 42's intent classifier extension
point and existing intent classification naming convention. Recommend naming
for two new Phase 54 classifications following the convention enumerated.
Produce findings at /Users/dunin7/loomworks-engine/docs/phase-impl-notes/
phase-54-step-0_5-findings-v0_1.md.
Single section. Verdict (HOLDS / HOLDS-with-complexity / PARTIALLY HOLDS /
BREAKS / INCONCLUSIVE), evidence (file paths, line numbers, enumerated
classification list with verbatim names and structural forms, verbatim
snippets of the registration pattern), implication for scoping note (P54-D7
settlement recommendation; any additional P54-D items if extension-point
complexity surfaces).
V7 explicitly requires enumeration of existing intent classifications. If
enumeration surfaces a count or shape materially different from what the
scoping note assumes, report it as a finding worth recording — same lens-
bounded scoping evidence cascade discipline as Step 0.
Do not propose remediation. Do not edit the scoping note. Do not start CR
drafting or implementation.
Report back with the findings document.
loomworks-phase-54-scoping-note-v0_2.md — parent scoping note.phase-54-step-0-findings-v0_1.md (engine repo docs/phase-impl-notes/) — Step 0 findings; V3 specifically.phase-42-cr-intent-classification-and-reactive-companion-v0_1.md (engine repo docs/phase-crs/) — Phase 42 design intent.loomworks-phase-54-step-0-inspection-brief-v0_1.md — Step 0 brief (precedent for this mini-brief's structure).DUNIN7 — Done In Seven LLC — Miami, Florida Loomworks Phase 54 Step 0.5 Inspection Brief (V7 mini-brief) — v0.1 — 2026-05-10